Wednesday, April 10, 2013, 12:14, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Conditioning Ta#40
|
Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.
Wednesday, April 10, 2013, 13:05: Venting
Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts. |
Thursday, April 18, 2013, 13:50, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Ta#40 stored under vacuum
|
Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos |
Thursday, June 23, 2022, 11:00, Aaron Schmidt, SiC#44, HP-FEBIAD, ITE, TM4, 37978-1, 44378-24, In progress, Conditioning SiC#44
|
Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A open.
Thursday, June 23, 2022, 11:34: TP1B on |
Tuesday, December 12, 2023, 16:11, Dave Neilson, Shunt #0, , , , -, -, , P2N Thermal Test
|
Tuesday, December 12, 2023, 16:07 - Pumping down test stand overnight for testing tomorrow. vacuum good, turbos starting now. Four thermocouples
attached inside. tc1: high on (+) TGHT leg, pins 1+2. tc2: at target terminal (+), pins 4+5. tc3: at target terminal (-), pins 6+7. tc4: low on (+) TGHT
leg, pins 8+9. |
Friday, December 01, 2017, 14:31, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, Silver plated bolts test / Outgas TS
|
Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.
Friday, December 01, 2017, 14:26: Roughing. BV1B open.
Friday, December 01, 2017, 14:27: BV1A open |
Tuesday, December 12, 2017, 08:32, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Pump down w/ possible outgas
|
Check achievable vacuum. Watch for spikes on RGA. Silver bolts removed from the chamber. Vented steel screws in.
Tuesday, December 12, 2017, 08:23: Doors open from previous test. (Open for 7 minutes)
Tuesday, December 12, 2017, 08:30: Doors closed. Roughing. |
Wednesday, December 20, 2017, 09:11, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Holiday Shut Down
|
Power/sources already off. The water cooling is currently left on.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off. |
Friday, January 26, 2018, 13:59, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 1
|
Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.
Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV. |
Monday, January 29, 2018, 10:07, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Power outage / HV test 2
|
HV test 2 cancelled. 9:38: BIAS/EZL/EE @ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) Power went out completely
Monday, January 29, 2018, 10:00: Power up TS |
Tuesday, January 30, 2018, 06:51, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 3
|
Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 30, 2018, 06:58: Optics on / set |
Wednesday, January 31, 2018, 09:53, Aaron Schmidt, , , , , (Blank), 42752-3, Done, Wire moved.
|
Wednesday, January 31, 2018, 09:50: A wire (B - F) was too close (Almost touching) to the EZL and had visible sparks during HV tests 1 & 2. The wire
was adjusted to sit higher. and away from the EZL |
Wednesday, January 31, 2018, 12:58, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, HV test 4
|
Wednesday, January 31, 2018, 12:53: Power/sources on.
Wednesday, January 31, 2018, 12:58: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:02: BIAS / EZL / EE @ 40 / 17 / 2 |
Thursday, February 04, 2021, 19:22, Fernando Maldonado, , LP-SIS, , , 44139-10 , 44378-2, Done, Energy spread calibration with SIS
|
See e-log entry: 884:
Thursday, February 04, 2021, 18:45: Roughing
Thursday, February 04, 2021, 19:13: Turbos on. |
Wednesday, June 29, 2011, 15:30, John Wong, , , , , , , , Testing Yield station elog
|
ABC 123 blah blah blah... |
Thursday, September 15, 2011, 09:20, Anders Mjos, , , , , , , , ISAC TestStand old e-log
|
link to old e-log |
Thursday, September 15, 2011, 13:46, Anders Mjos, FEBIAD Test, HP-FEBIAD, , , , , Failed, FEBIAD Broken Tube
|
See attached file for photos of the broken tube |
Friday, September 23, 2011, 15:38, Rick Maharaj, , , , , , , , test stand vented
|
Test stand vented |
Friday, September 23, 2011, 16:40, Anders Mjos, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding
mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the
next FEBIAD target. |
Monday, September 26, 2011, 14:56, John Wong, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Anders Mjos wrote:
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn |
Monday, September 26, 2011, 16:14, Anders Mjos, , , , , , , Problems/Solutions, Fixed leak on water line for HS, added Kapton insulation
|
While testing SiC#26 a leak was discovered on the water line to the heat shield. The leak was in the right joint (see attachment). The heat
shield water lines were removed from the test stand and repaired in the Machine Shop.
Kapton was added to the FEBIAD coil line to prevent
it from shorting to the target heater line (see attachment).
|
|