845
|
Thursday, February 04, 2021, 19:22 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Done | Energy spread calibration with SIS | See e-log entry: 884:
Thursday, February 04, 2021, 18:45:
Roughing |
|
849
|
Friday, February 12, 2021, 12:16 |
Fernando Maldonado | | | | | | | Problems/Solutions | Grounding collimator cable from outside | Friday, February 12, 2021, 12:13:
Since the collimator is not used, Carla and
I installed a BNC short outside the cage. |
|
850
|
Friday, February 12, 2021, 16:38 |
Fernando Maldonado | | | | | | | Failed | FEBIAD parameter scan - efficiency measurements - energy spread. | Friday, February 12, 2021, 16:37: FEBIAD
installed with mechanical calibrated leak
Friday, February 12, 2021, 16:38: |
|
851
|
Tuesday, February 16, 2021, 14:52 |
Fernando Maldonado | | | | | | | Problems/Solutions | Leak checking gas lines. | Vacuum side
Tuesday, February 16, 2021, 13:42:
The gas lines inside have been check. The |
|
854
|
Thursday, February 18, 2021, 15:15 |
Fernando Maldonado | | | | | | | Done | HLA tests | Thursday, February 18, 2021, 15:01: With
the help of Spencer Kiy, we tested the proper
communication from python to epics. |
|
855
|
Thursday, February 18, 2021, 16:48 |
Fernando Maldonado | | | | | | | Failed | FEBIAD parameter scans | Thursday, February 18, 2021, 15:19: Gas
lines roughed and refilled. Gauge reads -50
kPa. Absolute pressure is 50 kPa. |
|
856
|
Friday, February 19, 2021, 13:44 |
Fernando Maldonado | | | | | | | Failed | FEBIAD parameter scans | Friday, February 19, 2021, 13:28: Roughing
Friday, February 19, 2021, 13:43:
Power on |
|
857
|
Monday, February 22, 2021, 18:25 |
Fernando Maldonado | | HP-FEBIAD | | | | | Done | FEBIAD parameter scans | Monday, February 22, 2021, 17:48 Roughing
Monday, February 22, 2021, 18:17:
Turbos on. |
|
858
|
Monday, March 01, 2021, 12:58 |
Fernando Maldonado | | LP-FEBIAD | | | | | Done | FEBIAD parameter scans v2 | Monday, March 01, 2021, 12:57: Roughing
Monday, March 01, 2021, 13:30: Turbos
on. Started a bit late as I was distracted. |
|
859
|
Monday, March 01, 2021, 16:13 |
Fernando Maldonado | | | | | | | Done | Temporary RGA installation | Monday, March 01, 2021, 16:03: An
ExTorr RGA has been installed in the ISAC
test stand. |
|
884
|
Wednesday, June 30, 2021, 19:08 |
Fernando Maldonado | | LP-FEBIAD | | | | | Failed | FEBIAD parameter scan - efficiency measurements | Wednesday, June 30, 2021, 19:08: Roughing
Thursday, July 01, 2021,
08:57: Turbos on |
|
885
|
Thursday, July 22, 2021, 17:43 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD efficiency measurements | Thursday, July 22, 2021, 17:43: Roughing
New argon gas bottle installed.
Thursday, July 22, 2021, 18:16: Turbos |
|
886
|
Monday, July 26, 2021, 17:35 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD efficiency measurements. | Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos
on. |
|
887
|
Tuesday, July 27, 2021, 12:57 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD parameter scan - efficiency measurements | Assembly has new gas tube to the
target for better fit and clearance to the
HS. |
|
888
|
Wednesday, July 28, 2021, 08:48 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD parameter scan - efficiency measurements | Modified spiral tube from VCR to
counteract torque towards the HS. Now points
towards TBHT. |
|
890
|
Friday, July 30, 2021, 16:28 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Done | FEBIAD parameter scan - efficiency measurements | Restarting everything after swapping
RP1 (see elog 889).
|
|
891
|
Tuesday, August 03, 2021, 11:55 |
Fernando Maldonado | | | | | | | Problems/Solutions | Swapped emmittance meter voltage cables. | After not being able to get beam through
the emittance meter. I diagnosed that the
plates was not biased (reason yet unknow). |
|
892
|
Thursday, August 05, 2021, 08:49 |
Fernando Maldonado | | | | | | | Problems/Solutions | CANBUS snooper set up to investigate random optics turnining off | Problem: Some devices
turn off unexpectedly and sometimes without
any obvious trigger. In the past, the only |
|
893
|
Saturday, August 07, 2021, 18:07 |
Fernando Maldonado | | | | | | | Problems/Solutions | FC0 lasrge oscillation and RMPs offset. Both started today. [Got solved by itself] | Saturday, August 07, 2021, 18:02: As mentions
in previous entries, the FC0 current oscillates
with no change on ion source parameters. |
|
894
|
Monday, August 23, 2021, 09:55 |
Fernando Maldonado | | | | | | | Problems/Solutions | RP1 changed back | Monday, August 23, 2021, 09:53: RP1
was swapped back to our original pump. (see e-log |
|