Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 4 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  31   Tuesday, March 19, 2013, 13:32 John WongSiC#28-RFQLP-SIS TM4LP-RFQ (NEW) SpentSiC#28-RFQ target description Tuesday, March 19, 2013, 12:28
SiC#28 - RFQ target description: 
Total SiC foils = 325 discs
 SiC#28_RFQ_density_measurements.xlsx 
  32   Thursday, April 11, 2013, 14:30 John WongTa#39LP-SISITWTM139165-7 SpentTa#39 target descriptionTa#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
  
  33   Thursday, May 30, 2013, 16:58 John WongUCx#6LP-SIS TM139165-639230-8SpentUCx#6 - target description  Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment
#1. 
 UCx#6_specifications.PNG 
  34   Wednesday, July 10, 2013, 18:41 John WongSiC#29HP-FEBIAD-CTLITETM438481-639956-4SpentSiC#29 - Target descriptionWednesday, July 10, 2013, 18:32 
SiC#29 HP-FEBIAD-CTL target description: 
Total SiC foils = 510 discs 
 SiC#29_density_measurements_final.xlsx 
  35   Friday, August 30, 2013, 12:08 John WongUCx#7LP-SISITWTM138634-739230-4SpentUCx#7 - target descriptionFriday, August 30, 2013, 12:06
UCx#7 target specification, see attachment
#1.
 UCx#7_specifications.PNG 
  36   Friday, August 30, 2013, 14:45 John WongNiO#2HP-FEBIAD  39530-639069-4SpentNiO target descriptionFriday, August 30, 2013, 14:38 
NiO/Ni#2                                            
Average
  
  37   Friday, October 25, 2013, 17:35 John WongTa#41HP-SISITWTM438817-10 SpentTa#41 target descriptionFriday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400
  
  38   Wednesday, November 27, 2013, 17:56 John WongUCx#8LP-IG-LISITETM439814-IV SpentUCx#8 target description Wednesday, November 27, 2013, 17:49
UCx#8 target description - see attachment#1

 
 UCx_8_specification.PNG 
  39   Monday, March 17, 2014, 16:15 John WongTa#42LP-SISITWTM440282-139956-1SpentTa#42 Target description Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
  
  40   Monday, March 31, 2014, 15:02 John WongTiC#4HP-SIS  38817-839956-10SpentTarget Description  Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC
+ graphite foils. 
 TiC#4_description.JPG 
  41   Wednesday, April 30, 2014, 16:36 John WongSiC#30HP-FEBIADITETM338481-8 SpentSiC#30 Target description Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011. 
 SiC#30_density_measurements.xlsx 
  42   Friday, June 06, 2014, 14:09 John WongUCx#9LP-SIS  39165-9 ReadyUCx#9 - Target description  Friday, June 06, 2014, 14:08
See attachment for the target description

 
 UCx#9_target_description_1.JPG 
  45   Monday, July 28, 2014, 15:57 John WongZrC#6LP-SISITWTM140282-3 SpentZrC target description  Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description. 
Target is currently undergoing the
 ZrC#6.JPG 
  53   Monday, July 06, 2015, 12:18 John WongZrC#7LP-SISITWTM241177-1 FailedZrC#7 target description

    

       
            
  
  54   Tuesday, July 07, 2015, 13:00 John WongZrC#7LP-SISITWTM241177-2 ReadyZrC#7 (backup1) target descriptionTuesday, July 07, 2015, 12:36 
Total no. discs = 422
Total packed length = 13.2 cm (measured
 ZrC#7_backup.PNGZrC_specification_(backup#1_WO#41177-2).xlsx 
  55   Friday, July 10, 2015, 11:23 John WongUCx#13LP-IG-LISITETM440860-1 ReadyUCx#13 Target description Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target
description.   
 UCx_13_target_description.PNG 
  58   Wednesday, September 30, 2015, 17:08 John WongTa # 46HP-SIS  41369-3 ReadyTa#46 target description

    

       
            
  
  67   Friday, September 02, 2016, 14:45 John WongSiC#34LP-IG-LIS  39814-V2-1 ReadySiC#34 Target Description  Friday, September 02, 2016, 14:43
See attachment for target description 

 
 SiC34_target_description.JPG 
  68   Friday, October 07, 2016, 16:27 John WongSiC#35HP-FEBIAD  39530-9 ReadySiC35 Target description Friday, October 07, 2016, 16:28
See attachment for the target description

 
 SiC35_target_description.JPG 
  83   Friday, July 13, 2018, 14:41 John WongUCx#23LP-FEBIAD-CTL    ReadyUCx#23 target descriptionFriday, July 13, 2018, 14:40
Target is ready for installation. 
See attachment for description
 UCx_23-target_description.JPG 
ELOG V2.9.2-2455