Entry  Tuesday, March 19, 2013, 13:32, John Wong, SiC#28-RFQ, LP-SIS, , TM4, LP-RFQ (NEW), , Spent, SiC#28-RFQ target description SiC#28_RFQ_density_measurements.xlsx
 Tuesday, March 19, 2013, 12:28
SiC#28 - RFQ target description: 
Total SiC foils = 325 discs
Entry  Thursday, April 11, 2013, 14:30, John Wong, Ta#39, LP-SIS, ITW, TM1, 39165-7, , Spent, Ta#39 target description 
Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Entry  Thursday, May 30, 2013, 16:58, John Wong, UCx#6, LP-SIS, , TM1, 39165-6, 39230-8, Spent, UCx#6 - target description  UCx#6_specifications.PNG
 Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment #1. 
The target is currently undergoing the final conditioning in the Evaporator#1.
Entry  Wednesday, July 10, 2013, 18:41, John Wong, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Spent, SiC#29 - Target description SiC#29_density_measurements_final.xlsx
Wednesday, July 10, 2013, 18:32 
SiC#29 HP-FEBIAD-CTL target description: 
Total SiC foils = 510 discs 
Entry  Friday, August 30, 2013, 12:08, John Wong, UCx#7, LP-SIS, ITW, TM1, 38634-7, 39230-4, Spent, UCx#7 - target description UCx#7_specifications.PNG
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.
Entry  Friday, August 30, 2013, 14:45, John Wong, NiO#2, HP-FEBIAD, , , 39530-6, 39069-4, Spent, NiO target description 
Friday, August 30, 2013, 14:38 
NiO/Ni#2                                            
Average
Entry  Friday, October 25, 2013, 17:35, John Wong, Ta#41, HP-SIS, ITW, TM4, 38817-10, , Spent, Ta#41 target description 
Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400
Entry  Wednesday, November 27, 2013, 17:56, John Wong, UCx#8, LP-IG-LIS, ITE, TM4, 39814-IV, , Spent, UCx#8 target description  UCx_8_specification.PNG
Wednesday, November 27, 2013, 17:49
UCx#8 target description - see attachment#1

 
Entry  Monday, March 17, 2014, 16:15, John Wong, Ta#42, LP-SIS, ITW, TM4, 40282-1, 39956-1, Spent, Ta#42 Target description  
Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
Entry  Monday, March 31, 2014, 15:02, John Wong, TiC#4, HP-SIS, , , 38817-8, 39956-10, Spent, Target Description  TiC#4_description.JPG
 Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC + graphite foils. 
Total length = 11.7cm 
Entry  Wednesday, April 30, 2014, 16:36, John Wong, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, , Spent, SiC#30 Target description  SiC#30_density_measurements.xlsx
Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011.  The endcaps were replaced after they got vaporized in Evap#1 during the sintering process, and the target
Entry  Friday, June 06, 2014, 14:09, John Wong, UCx#9, LP-SIS, , , 39165-9, , Ready, UCx#9 - Target description  UCx#9_target_description_1.JPG
 Friday, June 06, 2014, 14:08
See attachment for the target description

 
Entry  Monday, July 28, 2014, 15:57, John Wong, ZrC#6, LP-SIS, ITW, TM1, 40282-3, , Spent, ZrC target description  ZrC#6.JPG
 Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description. 
Target is currently undergoing the sintering process
    Reply  Monday, July 06, 2015, 12:18, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Failed, ZrC#7 target description  


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, June 03, 2015, 10:53
Entry  Tuesday, July 07, 2015, 13:00, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-2, , Ready, ZrC#7 (backup1) target description ZrC#7_backup.PNGZrC_specification_(backup#1_WO#41177-2).xlsx
Tuesday, July 07, 2015, 12:36 
Total no. discs = 422
Total packed length = 13.2 cm (measured after the sintering process) 
Entry  Friday, July 10, 2015, 11:23, John Wong, UCx#13, LP-IG-LIS, ITE, TM4, 40860-1, , Ready, UCx#13 Target description UCx_13_target_description.PNG
 Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target description.   
Note:  Target container was coated/sintered with TaC twice.  Would like to see if this will improve the life-span of the target.  
    Reply  Wednesday, September 30, 2015, 17:08, John Wong, Ta # 46, HP-SIS, , , 41369-3, , Ready, Ta#46 target description 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, September 10, 2015, 13:31
Entry  Friday, September 02, 2016, 14:45, John Wong, SiC#34, LP-IG-LIS, , , 39814-V2-1, , Ready, SiC#34 Target Description  SiC34_target_description.JPG
 Friday, September 02, 2016, 14:43
See attachment for target description 

 
Entry  Friday, October 07, 2016, 16:27, John Wong, SiC#35, HP-FEBIAD, , , 39530-9, , Ready, SiC35 Target description  SiC35_target_description.JPG
Friday, October 07, 2016, 16:28
See attachment for the target description

 
Entry  Friday, July 13, 2018, 14:41, John Wong, UCx#23, LP-FEBIAD-CTL, , , , , Ready, UCx#23 target description UCx_23-target_description.JPG
Friday, July 13, 2018, 14:40
Target is ready for installation. 
See attachment for description