Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 2 of 8  Not logged in ELOG logo
Entry  Friday, July 10, 2015, 11:23, John Wong, UCx#13, LP-IG-LIS, ITE, TM4, 40860-1, , Ready, UCx#13 Target description UCx_13_target_description.PNG
 Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target description.   
Note:  Target container was coated/sintered with TaC twice.  Would like to see if this will improve the life-span of the target.  
Entry  Friday, March 11, 2016, 10:18, Laura Lambert, Ta # 47, , ITE, TM4, , , Spent, Ta # 47 target desscription 
Friday, March 11, 2016, 10:13 
Ta#47 LP-SIS [new small center block] target description:
Total Ta foils = 470
Entry  Tuesday, March 07, 2017, 10:00, Laura Lambert, UCx#19, LP-SIS, , TM4, 42218-12, , Ready, UCx#19 Target Description UCx#19_description.jpg
 Tuesday, March 07, 2017, 09:54
Attached please find the UCx#19 target description.

 
Entry  Tuesday, May 16, 2017, 13:18, Laura Lambert, UCx#20, LP-IG-LIS, ITE, TM4, 42218-1, , Ready, UCx#20 Target Description target_description.JPG
 Tuesday, May 16, 2017, 13:13
Attached please find the UCx#20 target description.

 
Entry  Wednesday, May 31, 2017, 09:53, Laura Lambert, Ta# 52, LP-SIS, , TM4, 42218-14, , In progress, Ta#52 target description 
 Wednesday, May 31, 2017, 09:51
Ta#52 LP-SIS target description:
Total Ta foils = 400 [4x20 packs + 320 single discs]
Entry  Wednesday, September 27, 2017, 09:14, Laura Lambert, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, , Ready, SiC#37 target description Target_Description.JPG
 Wednesday, September 27, 2017, 09:13
See attachment for target description.

 
Entry  Monday, October 15, 2018, 07:36, Aaron Schmidt, Ta#57, , ITE, TM4, 41177-3, , , Ta#57 Target Description. 
(Laura Lambert: Evap 2 Elog ID: 404) Tuesday, April 17, 2018, 10:20
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Entry  Tuesday, October 06, 2020, 14:25, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, , In progress, Ta#61 Target Description 
 Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Tuesday, October 27, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITE, TM4, 44508-2, , Ready, Nb#9 LP-SIS target description Nb#9_Target_Loading_data.pdf
 Nb#9 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, November 12, 2020, 11:32, Darwin Ortiz Rosales, UCx#31, HP-SIS, ITE, TM4, 44160, 43822, Ready, UCx#31-Target_description UCx31-target_description.png
 Target full name ITE-TM4-UC#
Entry  Tuesday, March 16, 2021, 17:05, Luca Egoriti, ITE-TM4-UC#32-P2N-SIS, HP-SIS, ITE, TM4, -, -, In progress, UO2 discs cutting UC32-P2N_material_info.jpgFume_hood.jpg
This afternoon, Darwin prepared in the hot lab fume hood the two UO2 slurries to be cut into P2N target discs. Later, I took over cutting both slurries.
A total of 49 annular discs were cut and loaded into the P2N graphite container.
The discs thickness was measured by stacking 5 discs on each other, and measuring their thickness in two points.
Entry  Wednesday, June 23, 2021, 18:13, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, , In progress, Ta#62 Target Description (2) 
 Ta#62 LP-SIS target description: (REPLACEMENT FOR 44139-10)
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Wednesday, November 10, 2021, 18:09, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, , In progress, Ta#63 Ta#63_Target_Loading_Data.pdf
  Ta#63 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, June 02, 2022, 16:55, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, , In progress, Ta#64 Target Description Ta#64_Target_Loading_Data.pdf
Thursday, June 02, 2022, 16:54: 
Ta#64 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Wednesday, April 30, 2014, 16:36, John Wong, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, , Spent, SiC#30 Target description  SiC#30_density_measurements.xlsx
Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011.  The endcaps were replaced after they got vaporized in Evap#1 during the sintering process, and the target
Entry  Wednesday, June 03, 2015, 10:55, Laura Lambert, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Ready, ZrC#7 target description  target_production_elog_ZrC#7.JPGZrC#7_final_density.xlsx
 Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
    Reply  Monday, July 06, 2015, 12:18, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Failed, ZrC#7 target description  


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, June 03, 2015, 10:53
Entry  Tuesday, July 07, 2015, 13:00, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-2, , Ready, ZrC#7 (backup1) target description ZrC#7_backup.PNGZrC_specification_(backup#1_WO#41177-2).xlsx
Tuesday, July 07, 2015, 12:36 
Total no. discs = 422
Total packed length = 13.2 cm (measured after the sintering process) 
Entry  Wednesday, March 08, 2017, 15:42, Laura Lambert, Ta#51, LP-SIS, , TM2, 41790-4, , In progress, Ta#51 target description 
 Wednesday, March 08, 2017, 15:40
Ta#51 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Tuesday, May 30, 2017, 15:15, Laura Lambert, SiC#36, HP-FEBIAD-CTL, , TM2, 41369-10, , Ready, SiC#36 target description SiC#36_Target_Description.JPG
 Tuesday, May 30, 2017, 15:12
See attachment for target description.

 
ELOG V2.9.2-2455