122
|
Thursday, October 16, 2014, 17:44 |
Ron Kuramoto | Repair | Target 2 | Water Leak | 1A Tunnel T2 Cu-ALCW water leak repair |
|
6x |
|
123
|
Thursday, November 06, 2014, 17:18 |
Ron Kuramoto | Repair | Target 2 | Cooling | 1AT2 Collimator B, faulty Thermister water out temperature | On 14Oct2014, the 1AT2 Collimator B water
outlet temperature rose to 100o
C. |
|
|
124
|
Thursday, November 06, 2014, 17:22 |
Ron Kuramoto | Repair | Target 2 | Cooling | 1AT2, faulty Thermister water out temperture |
|
|
|
125
|
Friday, November 14, 2014, 17:30 |
Isaac Earle | Repair | Target 1 | Target | T1-MK1 Target Failure / T1 Target Swap | -
On Nov 13 at ~1am the BL1A vacuum went bad.
The T1 and T2 volumes were isolated |
|
|
127
|
Monday, November 17, 2014, 10:25 |
Isaac Earle | Repair | Target 1 | Other | Amplified Air Leak In T1 Area Repaired | While the 1A blocks over the T1 area were
removed last week the opportunity was used
to investigate an air leak on the amplified |
|
|
129
|
Tuesday, December 09, 2014, 14:45 |
Isaac Earle | Repair | Target 1 | Target | T1-MK1 Repair Status (Pos'n 1 Plug Leak) | Between Nov 14 ~ Dec 9 the following
activities took place:
- The leaky 10mm Be target at pos'n |
|
|
133
|
Wednesday, January 07, 2015, 17:27 |
Isaac Earle | Repair | Target 2 | Water Leak | Water Leaks at T2 Cooling Package | The T2 cooling package was visually inspected
today after blocks were removed. With
the cooling package off the following leaks |
|
|
137
|
Friday, January 23, 2015, 13:28 |
Isaac Earle | Repair | Target 2 | Cooling | T2 Cooling Package Thermistor Defeats | Both defeats applied to T2 cooling package
thermistors were removed today (Col. B interlock
was jumpered, and the target water inlet |
|
|
138
|
Tuesday, January 27, 2015, 17:38 |
Isaac Earle | Repair | Target 1 | Cooling | T1 Cooling Package 3/4" Valves Rebuilt - T1 MRO Complete | - Both 3/4" ball valves on the T1
cooling package target water circuit were
rebuilt, leak tested with house air pressure, |
|
|
140
|
Friday, February 06, 2015, 12:39 |
Isaac Earle | Repair | Target 1 | Target | T1-MK1 Repair Status (Pos'n 1 Plug Leak) | The T1-MK1 target is currently in
the hot cell for repair of a leak at position
1. See E-Log #129 for details on previous |
|
|
141
|
Wednesday, February 18, 2015, 14:49 |
Isaac Earle | Repair | Target 1 | Target | T1-MK1 Repair Complete | This is a continuation of work detailed
in E-Log #129 and #140.
- Static water test performed on |
|
|
144
|
Wednesday, March 04, 2015, 18:08 |
Isaac Earle | Repair | Target 2 | Cooling | T2 Cooling Package MRO Update | The following work was done today at the
T2 cooling package:
- Remainder of #4 Hansen o-rings |
|
|
146
|
Tuesday, March 31, 2015, 17:40 |
Isaac Earle | Repair | Target 2 | Cooling | T2 Thermistors Replaced | The Inlet (T1), Outlet (T2), Col.A (T6),
and Col. B (T7) thermistors at the T2 cooling
package all gave intermittent faulty readings |
|
|
158
|
Friday, May 01, 2015, 16:01 |
Isaac Earle | Repair | Target 1 | Other | RH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak Check | The Meson Hall RH Lab Warm Cell was used
by Beamlines Group for hydrostatic testing
of the TNF heat exchanger. The location |
|
|
161
|
Monday, May 25, 2015, 12:48 |
Isaac Earle | Repair | Target 1 | Controls | T1/T2 Controls System Crash | At 9:15am this morning BL1A tripped off
due to loss of the watchdog signals for the
T1/T2 control system. Graham Waters |
|
|
170
|
Wednesday, August 19, 2015, 12:10 |
Isaac Earle | Repair | Other | Other | Warm Cell Water Window Seal Replacement Status | The following tasks were completed over
the past 2 weeks:
- Aquarium Technology Ltd. (UK) was |
6x |
|
171
|
Thursday, August 27, 2015, 15:47 |
Isaac Earle | Repair | Other | Water Leak | Warm Cell Water Window Seal Replacement Update | Since the previous E-Log the following
tasks have been completed:
- Panel spacer rods installed at |
|
|
173
|
Monday, September 28, 2015, 11:33 |
Isaac Earle | Repair | Other | Water Leak | Warm Cell Water Window Repair Complete | The warm cell water window tanks were filled
on September 17 after 2 weeks of curing time.
A water leak was found coming from |
|
|
175
|
Thursday, October 01, 2015, 11:43 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Target Ladder Drive Motor Failure | The stepper motor that drives the
target ladder on T2-MK2 has failed. This
is the cause of the difficulty moving the |
|
|
179
|
Friday, October 09, 2015, 14:56 |
Isaac Earle | Repair | Target 2 | Other | T2 Protect Monitor Replacement | On Monday Oct 5th a decision was
made to uncover and remove the T2 Protect
Monitor due to faulty readings. The |
9x |