  ID Date Author Category Type Specificdown Subject Text Attachments
  182   Tuesday, October 13, 2015, 10:52 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Target Ladder Moves The T1 and T2 targets were both moved
from Position 0 to Position 4 at approximately
2:30am on Saturday October 10th using the
  
  183   Thursday, November 05, 2015, 17:07 Isaac EarleRepairTarget 2TargetT2-MK1 Profile Monitor Repair and Pos'n 3 Target RemovalThe following work was performed on the
T2-MK1 target.  The profile monitor
and monitor cage on this target were damaged
 8x 
  184   Thursday, December 17, 2015, 13:31 Grant MinorDevelopmentOtherTargetT1/T2 Target Cassette - window / end cap manufacturing change (WO 41527)Isaac Earle has recently been managing
the fabrication of some new Be  target cassettes
for the T1 / T2 Meson Hall target ladders
 Left_new_right_old_ref_TBP1683_16Dec2015.JPGTBP1690_left_new_right_old_16Dec2015.JPGTBP1683_forming_tool_16Dec2015.JPGNew_Frame_Ref_TBP1696_16Dec2015.pdf 
  192   Thursday, March 24, 2016, 15:38 Isaac EarleDevelopmentTarget 1TargetT1/T2 Beryllium Target Test Jig Fabrication CompleteFabrication of the T1/T2 beryllium target
testing jig (TBP1721) was completed today
by Dan MacDonald.  With a target installed
 IMG_6904.JPG 
  193   Thursday, March 31, 2016, 11:48 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Beryllium Target Manufacturing CompleteManufacturing of a new batch of T1 and
T2 beryllium targets has been completed.
The job was completed under Machine
 T1_T2_Be_Target_Documentation_(2016_Batch).xlsx 
  196   Monday, April 11, 2016, 13:54 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Transported from BL to HCThe T2-MK2 target was transported from
the beam line to the hot cell using the transfer
flask.  The target was measured to be
  
  197   Friday, April 15, 2016, 14:54 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Changes & Return to BeamlineOn April 11th the T2-MK2 target was flushed
with water, then overnight with air at 5psi
supply pressure.  The target ladder
 T2-MK2_Position_4_Entrance_Side_-_April_14_2016.JPGT2-MK2_Position_4_Exit_Side_-_April_14_2016.JPGIMG_7024.JPGIMG_7026.JPG 
  198   Wednesday, April 20, 2016, 10:01 Isaac EarleStandard OperationTarget 1TargetT1/T2 Monitor Electrical Check CompleteMike Russell from Diagnostics Group has
completed an electrical check on the T1 and
T2 profile and protect monitors.  He
  
  200   Friday, May 13, 2016, 15:04 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Position 4 Adjusted to +1.5mm OffsetThe T2-MK2 target at Position 4 has been
adjust to approximately +1.5mm offset.  This
causes the ladder to be moved downwards,
  
  201   Wednesday, June 15, 2016, 11:00 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Moved to Position #1 Position #4 on the T2-MK2 target
has now reached the maximum beam time.  The
target was moved to Position #1 at the nominal
  
  208   Friday, September 30, 2016, 16:54 Isaac EarleRepairTarget 1TargetT1-MK2 - New Beryllium Targets Installed The following work was performed
on the T1-MK2 target assembly during the
September 2016 Mini-shutdown:
 T1-MK2_Posn_4_Entrance_Window_Beam_Spot_-_Sept_27_2016.JPGT1-MK2_Posn_4_Exit_Window_Beam_Spot_-_Sept_27_2016.JPGTarget_Info_Sheet_&_Elevations.pdf 
  212   Monday, January 09, 2017, 15:07 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Moved from BL to HC The T2-MK2 target assembly was moved
from the beam line to the hot cell today.
 A maximum field of 203mSv/hr was measured
  
  213   Thursday, January 12, 2017, 09:21 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Position 1 Beam Spot The beam spot on the 10cm beryllium
target in Position 1 on T2-MK2 (Target ID:
"OCT.06#3") was measured and photographed
 T2-MK2_Posn_1_Beam_Spot_-_Jan_11_2017.jpgT2-MK2_Position_1_Beam_Spot_Measurements_-_Jan_11_2017.pdf 
  218   Wednesday, April 05, 2017, 17:55 Isaac EarleDevelopmentOtherTargetT2 area devices alignment strategyA strategy for alignment of the T2 protect
monitor, T2 target, and T2 Collimator A was
discussed today and decided upon by Yuri
 Re__T2_target_and_protect_adjustment.pdf 
  220   Tuesday, April 11, 2017, 17:31 Isaac EarleDevelopmentTarget 2TargetT2-MK2 target MRO and alignment of T2 devicesThe following work was performed on
the T2-MK2 target assembly and the T2 Protect
assembly for maintenance purposes and to
 T2-MK2_-_2017.pdf 
  221   Friday, May 05, 2017, 15:09 Isaac EarleDevelopmentTarget 2TargetT2-MK2 beam spot check in hot cell On May 5th the T2-MK2 target was
moved to the hot cell for the purpose of
checking the beam spot on the Position 2
 T2MK2_Position_1_and_2_Exit.JPGT2MK2_Position_2_Entrance.JPGT2MK2_Position_2_Exit.JPGT2-MK2_profile_monitor_dislodged.JPG 
  223   Monday, May 15, 2017, 16:55 Isaac EarleOtherTarget 2TargetT2 profile monitor actuation issue On Thursday May 11th operators attempted
to move the T2 profile monitor (T2-MK2) to
the IN position but were unsuccessful.  The
  
  224   Monday, July 10, 2017, 16:20 Keith C NgRepairTarget 2TargetT2 Heat Exchanger Secondary Side Solenoid Valve Failure The T2 heat exchanger secondary side solenoid
failed on July 9 at approximately 19:30 (EPICS
ID: B1A:T2CS:SVSEC).  The valve was
 20170710_t2_water_package_repair.pdf 
  228   Tuesday, August 29, 2017, 12:17 Isaac EarleMaintenanceTarget 1TargetT1-MK1 and T2-MK1 Hansen water fittings replaced The #6 male Hansen fittings for the
T1-MK1 and T2-MK1 targets (both currently
stored in the target storage pit) were replaced
  
  229   Tuesday, October 10, 2017, 12:09 Isaac EarleStandard OperationTarget 2TargetT2-MK2 position 4 target changedThe following work was performed on
the T2-MK2 target assembly during the 2017
fall shutdown:
 20171005_t2target_0010.jpg20171005_t2target_0015.jpg20171005_t2target_0016.jpg 