ID Date Author Category Type Specificdown Subject Text Attachments
  94   Tuesday, November 26, 2013, 10:33 Isaac EarleRepairTarget 2TargetT2-MK2 Water Flush The T2-MK2 target in the hot cell
was flushed with water and then purged with
air so that stagnant water is not left sitting
  
  95   Monday, January 06, 2014, 15:55 Isaac EarleRepairTarget 2TargetT2-MK2 Repair The leaking 10cm Be target was removed
from position 3 on the T2-MK2 target ladder
and the water ports were blanked-off with
 DSC_6622.JPGDSC_6623.JPGDSC_6626.JPGIMG_1809.JPG 
  96   Thursday, January 09, 2014, 15:21 Isaac EarleRepairTarget 2TargetT2-MK2 Electrical Check An electrical check was performed
on the T2-MK2 profile monitor by Bill Rawnsley.
 All signals produced the expected response,
  
  99   Friday, January 17, 2014, 15:41 Isaac EarleStandard OperationTarget 1TargetWater Purged from T1 & T2 TargetsWater was purged from the T1 and T2 targets
using compressed air.  The water is
stored in a labeled bucket on the BL1A blocks
  
  103   Thursday, February 13, 2014, 14:27 Isaac EarleStandard OperationTarget 2TargetT2 Target MovesThe T2-MK1 target was moved from the beam
line to the target storage pit in position
4.  The target was measured to be 30mSv/hr
  
  104   Monday, March 03, 2014, 11:55 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Moved to HC The T2 Protect Monitor was transported
from the beam line to the hot cell this morning
using the transport flask.  The move
 IMG_1934.JPGIMG_1939.JPGIMG_1973.JPG 
  105   Tuesday, March 11, 2014, 13:50 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Returned to Beam LineAfter the monitor assembly was moved to
the hot cell, electrical checks were performed
by Bill Rawnsley which showed the same results
  
  109   Tuesday, April 01, 2014, 10:17 Isaac EarleRepairTarget 2TargetT2 Profile Monitor Actuation - Fault ReportThe T2 profile monitor cannot be actuated
from the control room.  When the solenoid
valve that supplies air to the air cylinders
  
  111   Thursday, April 03, 2014, 13:43 Isaac EarleStandard OperationTarget 2TargetT2 Profile Monitor OKT2 Profile Monitor actuation was tested
today from the control room and all is working
properly.  The position (IN / OUT) also
  
  113   Monday, April 14, 2014, 15:30 Isaac EarleStandard OperationTarget 2TargetT2 Target Moved to Position 4The T2-MK2 target (currently installed
in the beamline) was moved from position
0 to position 4 (10cm Be) using the portable
  
  114   Friday, May 02, 2014, 15:49 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Elevation CorrectionWhen beam was started in mid-April, it
was observed by Operations Group that with
the beam centered vertically within the protect
 RHB_6851.JPGRHB_6850.JPG 
  115   Monday, May 05, 2014, 15:46 Isaac EarleRepairTarget 2TargetT2 Protect Returned to B/LThe T2 protect monitor was returned to
the beam line using the shielded flask.  The
alignment pin did not align with the hole
  
  116   Wednesday, May 14, 2014, 20:36 Grant MinorDevelopmentTarget 2TargetTarget exercised to position 0, then back to 2.0 mm above position 4The T2 target was exercised to position
0 around 6:15pm so that the T2 profile monitor
could be used by operations.  The T2
  
  117   Tuesday, June 03, 2014, 22:56 Isaac EarleStandard OperationTarget 2TargetT2 Target Position Moves (Development Shift)The T2 target was moved from Position 4
to Position 0 at 11:15am so the profile monitor
could be used during the development shift.
  
  125   Friday, November 14, 2014, 17:30 Isaac EarleRepairTarget 1TargetT1-MK1 Target Failure / T1 Target Swap -
On Nov 13 at ~1am the BL1A vacuum went bad.
 The T1 and T2 volumes were isolated
 T1MK2_Nov_14_2014.pdf 
  129   Tuesday, December 09, 2014, 14:45 Isaac EarleRepairTarget 1TargetT1-MK1 Repair Status (Pos'n 1 Plug Leak) Between Nov 14 ~ Dec 9 the following
activities took place:
- The leaky 10mm Be target at pos'n
  
  135   Wednesday, January 14, 2015, 13:32 Isaac EarleStandard OperationTarget 1TargetT1-MK2 Moved from B/L to Storage PitThe T1-MK2 target was transferred from
the beam line to the storage pit in hole
#5 using the transfer flask.  A maximum
  
  140   Friday, February 06, 2015, 12:39 Isaac EarleRepairTarget 1TargetT1-MK1 Repair Status (Pos'n 1 Plug Leak) The T1-MK1 target is currently in
the hot cell for repair of a leak at position
1.  See E-Log #129 for details on previous
 IMG_4603.JPG 
  141   Wednesday, February 18, 2015, 14:49 Isaac EarleRepairTarget 1TargetT1-MK1 Repair CompleteThis is a continuation of work detailed
in E-Log #129 and #140.
- Static water test performed on
 IMG_4638.JPGIMG_4646.JPGIMG_4647.JPG 
  142   Friday, February 20, 2015, 13:55 Isaac EarleStandard OperationTarget 2TargetT1 & T2 Target Moves- The T1-MK1 target was moved from the
hot cell to storage pit hole #3 (ready as
T1 spare)
  