94
|
Tuesday, November 26, 2013, 10:33 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Water Flush | The T2-MK2 target in the hot cell
was flushed with water and then purged with
air so that stagnant water is not left sitting |
|
95
|
Monday, January 06, 2014, 15:55 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Repair | The leaking 10cm Be target was removed
from position 3 on the T2-MK2 target ladder
and the water ports were blanked-off with |
|
96
|
Thursday, January 09, 2014, 15:21 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Electrical Check | An electrical check was performed
on the T2-MK2 profile monitor by Bill Rawnsley.
All signals produced the expected response, |
|
99
|
Friday, January 17, 2014, 15:41 |
Isaac Earle | Standard Operation | Target 1 | Target | Water Purged from T1 & T2 Targets | Water was purged from the T1 and T2 targets
using compressed air. The water is
stored in a labeled bucket on the BL1A blocks |
|
103
|
Thursday, February 13, 2014, 14:27 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 Target Moves | The T2-MK1 target was moved from the beam
line to the target storage pit in position
4. The target was measured to be 30mSv/hr |
|
104
|
Monday, March 03, 2014, 11:55 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Moved to HC | The T2 Protect Monitor was transported
from the beam line to the hot cell this morning
using the transport flask. The move |
|
105
|
Tuesday, March 11, 2014, 13:50 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Returned to Beam Line | After the monitor assembly was moved to
the hot cell, electrical checks were performed
by Bill Rawnsley which showed the same results |
|
109
|
Tuesday, April 01, 2014, 10:17 |
Isaac Earle | Repair | Target 2 | Target | T2 Profile Monitor Actuation - Fault Report | The T2 profile monitor cannot be actuated
from the control room. When the solenoid
valve that supplies air to the air cylinders |
|
111
|
Thursday, April 03, 2014, 13:43 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 Profile Monitor OK | T2 Profile Monitor actuation was tested
today from the control room and all is working
properly. The position (IN / OUT) also |
|
113
|
Monday, April 14, 2014, 15:30 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 Target Moved to Position 4 | The T2-MK2 target (currently installed
in the beamline) was moved from position
0 to position 4 (10cm Be) using the portable |
|
114
|
Friday, May 02, 2014, 15:49 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Elevation Correction | When beam was started in mid-April, it
was observed by Operations Group that with
the beam centered vertically within the protect |
|
115
|
Monday, May 05, 2014, 15:46 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Returned to B/L | The T2 protect monitor was returned to
the beam line using the shielded flask. The
alignment pin did not align with the hole |
|
116
|
Wednesday, May 14, 2014, 20:36 |
Grant Minor | Development | Target 2 | Target | Target exercised to position 0, then back to 2.0 mm above position 4 | The T2 target was exercised to position
0 around 6:15pm so that the T2 profile monitor
could be used by operations. The T2 |
|
117
|
Tuesday, June 03, 2014, 22:56 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 Target Position Moves (Development Shift) | The T2 target was moved from Position 4
to Position 0 at 11:15am so the profile monitor
could be used during the development shift. |
|
125
|
Friday, November 14, 2014, 17:30 |
Isaac Earle | Repair | Target 1 | Target | T1-MK1 Target Failure / T1 Target Swap | -
On Nov 13 at ~1am the BL1A vacuum went bad.
The T1 and T2 volumes were isolated |
|
129
|
Tuesday, December 09, 2014, 14:45 |
Isaac Earle | Repair | Target 1 | Target | T1-MK1 Repair Status (Pos'n 1 Plug Leak) | Between Nov 14 ~ Dec 9 the following
activities took place:
- The leaky 10mm Be target at pos'n |
|
135
|
Wednesday, January 14, 2015, 13:32 |
Isaac Earle | Standard Operation | Target 1 | Target | T1-MK2 Moved from B/L to Storage Pit | The T1-MK2 target was transferred from
the beam line to the storage pit in hole
#5 using the transfer flask. A maximum |
|
140
|
Friday, February 06, 2015, 12:39 |
Isaac Earle | Repair | Target 1 | Target | T1-MK1 Repair Status (Pos'n 1 Plug Leak) | The T1-MK1 target is currently in
the hot cell for repair of a leak at position
1. See E-Log #129 for details on previous |
|
141
|
Wednesday, February 18, 2015, 14:49 |
Isaac Earle | Repair | Target 1 | Target | T1-MK1 Repair Complete | This is a continuation of work detailed
in E-Log #129 and #140.
- Static water test performed on |
|
142
|
Friday, February 20, 2015, 13:55 |
Isaac Earle | Standard Operation | Target 2 | Target | T1 & T2 Target Moves | - The T1-MK1 target was moved from the
hot cell to storage pit hole #3 (ready as
T1 spare) |
|