  36   Wednesday, June 06, 2012, 08:48 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side hot cell
manipulator was completed and the manipulator
was re-installed into the hot cell.  No
  
  37   Wednesday, June 06, 2012, 08:58 Isaac EarleMaintenanceTarget 2TargetT2 Monolith Leak Check While leak checking components in
the M20 front end on May 25th, the top of
the T2 monolith was also checked by flooding
  
  38   Thursday, June 07, 2012, 18:08 Isaac EarleRepairTarget 1TargetHot Cell Manipulator Broken Tape A tape snapped on the west side manipulator
today while working on the T1-MK2 target
repair.  The tape travels through to
  
  39   Friday, June 08, 2012, 16:52 Isaac EarleRepairTarget 1TargetBroken Manipulator Tape Update The broken tape on the west side
hot cell manipulator was found to be one
of two "Z motion slave tapes".
  
  40   Friday, June 08, 2012, 17:01 Isaac EarleRepairTarget 1TargetT1-MK2 Leak Repair Update A leak check was performed on the
T1-MK2 target in the hot cell today and confirmed
successful leak-free installation of the
  
  41   Monday, June 18, 2012, 16:27 Isaac EarleRepairTarget 1TargetT1-MK2 Profile and Protect Monitor Electronics Check Bill Rawnsley and Mike Russell performed
a 'blip' test on the T1-MK2 profile monitor
and protect monitors today.  A possible
  
  44   Friday, June 22, 2012, 13:54 Isaac EarleMaintenanceTarget 2TargetAir Amplifier Rebuild CompleteA full rebuild of the upper air amplifier
was completed.  New anodized aluminum
barrels were installed (replacing the old
  
  46   Friday, June 29, 2012, 14:18 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side hot cell
manipulator was completed and the manipulator
was re-installed into the cell.  The
  
  47   Tuesday, July 03, 2012, 13:23 Isaac EarleStandard OperationTarget 2TargetT2 Plug Block Replaced & Beam Blockers TestedThe T2 plug block was replaced and the
M9 and M20 beam blockers were tested.  The
plug block did not interfere with the travel
  
  48   Friday, July 06, 2012, 16:03 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair Complete Target elevation measurements and
beam spot plots were completed on the T1-MK2
target and the target is now fully repaired
 T1MK2_-_July_2012.pdf 
  49   Monday, July 09, 2012, 17:17 Isaac EarleStandard OperationTarget 1TargetBL1A Start-Up Prep - T1 & T2 targets switched to
"remote" control
 - Both target ladders were moved
  
  50   Wednesday, July 11, 2012, 17:51 Isaac EarleRepairTarget 1TargetT1 Target Swap BL1A was started yesterday and brought
up to 10
  
  52   Monday, July 23, 2012, 16:01 Isaac EarleDevelopmentTarget 1TargetTarget Flask Seismic Restraint Clamps Installed Installation of the seismic restraint
clamps has been completed for the MK1 and
MK2 target flasks in the Remote Handling
 IMG_0427.JPGIMG_0428.JPGIMG_0429.JPG 
  53   Friday, July 27, 2012, 14:48 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Update- T1MK1 target transferred from storage
pit to hot cell (max field: 4700 
  
  54   Wednesday, August 08, 2012, 14:40 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Complete- Re-wired profile monitor was received
from Probes Group and installed on the target
  
  55   Friday, September 07, 2012, 16:35 Isaac EarleRepairTarget 2TargetT2-MK1 Target Repair Completed - Profile monitor wiring harness
checked by Bill Rawnsley using resistor pack
--> OK
  
  56   Friday, September 07, 2012, 16:39 Isaac EarleRepairTarget 1TargetRH Lab Crane Repaired The "west" button on the
crane pendant was broken, and the crane would
occasionally continue moving west when the
  
  58   Tuesday, September 25, 2012, 16:31 Isaac EarleRepairTarget 1TargetT1/T2 Controls - The target control software was
modified to reference the correct pot. look-up
table for the target at T1 (T1-MK1)
  
  59   Friday, September 28, 2012, 15:19 Isaac EarleRepairTarget 1TargetT1-MK2 Delta Seal Leak  After removal of the leaky
target cassette at position 3, plugs were
installed on the target ladder and a leak
  
  60   Wednesday, October 24, 2012, 17:34 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair CompleteThe target ladder was detached, old delta
seals removed, sealing surfaces cleaned using
scotchbrite pad and a dremel tool, and delta
  