ID Date Author Category Type Specific Subjectdown Text Attachments
  116   Wednesday, May 14, 2014, 20:36 Grant MinorDevelopmentTarget 2TargetTarget exercised to position 0, then back to 2.0 mm above position 4The T2 target was exercised to position
0 around 6:15pm so that the T2 profile monitor
could be used by operations.  The T2
  
  157   Tuesday, April 28, 2015, 15:55 Isaac EarleDevelopmentTarget 1TargetTarget Version Jumper Wires Installed for T1-MK1 and T2-MK1 The T1-MK1 and T2-MK1 targets have
been re-wired to allow version identification.
 Work was performed in the target storage
  
  195   Monday, April 11, 2016, 13:51 Isaac EarleDevelopmentOtherOtherTarget Transfer Flask Hoist Hook Lower Limit Adjusted The lower limit of the flask hoist
hook has been adjusted.  The travelling
nut for the lower limit was rotated 3 notches
  
  303   Friday, September 23, 2022, 10:51 Matthew GareauStandard OperationTarget 2TargetTarget T2-MK2 moved to storage pitThe T2-MK2 target was transported from
the east hot cell to the storage pit at position
3.
 Storage_location_state_as_of_Sept_23_2022_(after_target_moves).jpg 
  174   Wednesday, September 30, 2015, 17:07 Isaac EarleStandard OperationTarget 2TargetTarget Moves for Profile Check - Possible Motor or Control Box FailureThe T1 and T2 targets were moved to position
zero, then back to the target position today
so that beam profile could be checked using
  
  68   Monday, January 14, 2013, 16:55 Isaac EarleStandard OperationTarget 2TargetTarget Move & Damaged Profile MonitorThe T2-MK1 target (spare T2 target) was
transported from the hot cell to the storage
pit today.  
  
  52   Monday, July 23, 2012, 16:01 Isaac EarleDevelopmentTarget 1TargetTarget Flask Seismic Restraint Clamps Installed Installation of the seismic restraint
clamps has been completed for the MK1 and
MK2 target flasks in the Remote Handling
 IMG_0427.JPGIMG_0428.JPGIMG_0429.JPG 
  188   Wednesday, February 24, 2016, 13:03 Isaac EarleRepairOtherOtherTarget Flask 2-Ton Hoist Chain Twist Corrected A 1/2 turn twist in the target flask
hoist chain has been corrected to address
a deficiency observed by inspectors by Gordon
  
  191   Thursday, March 24, 2016, 14:46 Isaac EarleOtherOtherOtherTNF / 500MeV Resin Cans Removed from Storage Pit #1Three used TNF / 500MeV system cooling
system resin cans were removed from the Meson
Hall target storage pit (two from Hole #1,
  
  147   Thursday, April 09, 2015, 13:56 Isaac EarleDevelopmentTarget 2TargetT2-MK2 target wired for version identification, cable ties replaced, ready for useThe "POT/CAM" MS connector on
the T2-MK2 has been wired to allow automatic
target version number identification by the
  
  72   Tuesday, February 05, 2013, 09:50 Isaac EarleMaintenanceTarget 2TargetT2-MK2 target moved from beam line to hot cellThe T2-MK2 target was transported from
the beam line to the RH hot cell.  The
profile monitor was secured in the 'in' position
 IMG_0868.JPG 
  302   Thursday, September 15, 2022, 14:34 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 target elevations measurementThe target elevations measurement and beam
spot checks were completed on Sept. 15, 2022.
This was done after a July 2022 target exchange
 T2-MK2_-_Sept_2022.pdf 
  220   Tuesday, April 11, 2017, 17:31 Isaac EarleDevelopmentTarget 2TargetT2-MK2 target MRO and alignment of T2 devicesThe following work was performed on
the T2-MK2 target assembly and the T2 Protect
assembly for maintenance purposes and to
 T2-MK2_-_2017.pdf 
  235   Friday, April 06, 2018, 15:05 Isaac EarleStandard OperationTarget 2TargetT2-MK2 target MROThe following is a summary of MRO work
done on the T2-MK2 target during the 2018
shutdown:
  
  229   Tuesday, October 10, 2017, 12:09 Isaac EarleStandard OperationTarget 2TargetT2-MK2 position 4 target changedThe following work was performed on
the T2-MK2 target assembly during the 2017
fall shutdown:
 20171005_t2target_0010.jpg20171005_t2target_0015.jpg20171005_t2target_0016.jpg 
  286   Wednesday, April 13, 2022, 12:31 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 moved: from target station to storageThe T2-MK2 target was moved from the target
station to the storage area (position 3).
Upon removal, it was measured with a pole
  
  293   Wednesday, May 25, 2022, 10:16 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 moved: from storage location to hot cellTarget T2-MK2 was moved from the storage
location (formerly position 3) to the hot
cell in preparation for replacement of end
  
  232   Wednesday, January 10, 2018, 17:45 Isaac EarleStandard OperationTarget 2TargetT2-MK2 beam spot photos, M20BB moved to storage pit The T2-MK2 target was moved from
the beamline to the hot cell on January 8th. 
The field at 0.5m was 130mSv/hr.  Photographs
 T2-MK2_Position_4_beam_spot_photo_-_12mm_Be_-_Jan_10_2018.jpgT2-MK2_Position_4_beam_spot_photo_-_12mm_Be_-_Jan_10_2018_s.jpg 
  221   Friday, May 05, 2017, 15:09 Isaac EarleDevelopmentTarget 2TargetT2-MK2 beam spot check in hot cell On May 5th the T2-MK2 target was
moved to the hot cell for the purpose of
checking the beam spot on the Position 2
 T2MK2_Position_1_and_2_Exit.JPGT2MK2_Position_2_Entrance.JPGT2MK2_Position_2_Exit.JPGT2-MK2_profile_monitor_dislodged.JPG 
  94   Tuesday, November 26, 2013, 10:33 Isaac EarleRepairTarget 2TargetT2-MK2 Water Flush The T2-MK2 target in the hot cell
was flushed with water and then purged with
air so that stagnant water is not left sitting
  