  RH-Meson Hall, Page 18 of 19  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Specific Subjectdown Text Attachments
  127   Monday, November 17, 2014, 10:25 Isaac EarleRepairTarget 1OtherAmplified Air Leak In T1 Area RepairedWhile the 1A blocks over the T1 area were
removed last week the opportunity was used
to investigate an air leak on the amplified
 IMG_4263.JPG 
  268   Thursday, July 09, 2020, 06:44 Isaac EarleDevelopmentOtherM9Alignment of M9 Q1Q2 magnets complete Mike Vogel reported that alignment
of the Q1Q2 assembly w.r.t. the T2 and B1
flanges was completed on July 7.  This
  
  18   Tuesday, February 21, 2012, 09:56 Isaac EarleRepairTarget 2TargetAir Supply Check Valve & Q4 Flow Transducer The faulty air pressure supply check
valve for M9BB, M20BB, and T2 Profile Monitor
was replaced.
 T2_Q4_Flow_Transducer.JPG 
  326   Thursday, March 30, 2023, 13:17 Albert KongMaintenanceOtherTargetAir Amplifier Testing: M9 BB (AKA T2 blocker), M20 BB, T2 MK1 prof. monitor, T1 MK1 prof. monitor actuationWe tested the air amplifiers by actuating
the beam blockers and profile monitors on
the T1 and T2 target stations. 
 T1_Mar30_2023_Vacuum.pngT2_Mar30_2023_Vacuum.pngIMG_1907.JPEG 
  150   Tuesday, April 21, 2015, 13:38 Isaac EarleStandard OperationTarget 1TargetAir Amplifier Started. T1 & T2 Profile Monitor Actuation Checked The lower air amplifier has been
started, and air supplied to the T1 and T2
areas by opening the appropriate ball valves
  
  44   Friday, June 22, 2012, 13:54 Isaac EarleMaintenanceTarget 2TargetAir Amplifier Rebuild CompleteA full rebuild of the upper air amplifier
was completed.  New anodized aluminum
barrels were installed (replacing the old
  
  119   Monday, August 11, 2014, 16:57 Isaac EarleRepairTarget 2OtherAir Amplifier Increased Cycle RateOn Friday August 8th Ron Kuramoto observed
that the Meson Hall air amplifier cycle speed
had increased.  Cycle time measurements
  
  271   Tuesday, November 24, 2020, 15:10 Isaac EarleStandard OperationTarget 2TargetAdditional targets added to T2-MK1 ladder The following work on the T2-MK1
target was completed sporadically over the
last few months:
  
  352   Thursday, August 22, 2024, 15:16 Adam NewsomeStandard OperationOtherActive SumpActive sump filled ~600L with grey water from RCR1 sump replacementDuring a replacement  of the RCR1 active
sump (mechanical services group), approximately
600L of non-active grey water was released
  
  205   Wednesday, July 06, 2016, 13:31 Isaac EarleOtherOtherActive SumpActive Sump RCR Lab and MCR Alarms Not Working - Suspect Controls IssueFurther tests were done on the active sump
high level float switch today.  The
switch was triggered 1 time by filling the
  
  354   Monday, September 09, 2024, 16:31 Albert KongStandard OperationOtherActive SumpActive Sump High Level Sensor TestingThe active sump high level sensor was tested
and correctly alarmed locally. However the
alarm in the MHESA RCR lab did not make any
  
  299   Monday, August 22, 2022, 09:01 Adam NewsomeStandard OperationOtherActive SumpActive Sump DrainingOn Aug. 18, 2022, Operations informed RH
group that an alarm activated for the full
status of the MHESA B1 RCR1 Lab holding tank.
  
  314   Tuesday, January 17, 2023, 13:49 Adam NewsomeRepairOtherActive SumpActive Sump - Valve V6 LeakingIt was noticed today (2023-01-17) that
the valve V6, used in draining the BL1A Holding
Tank to the Active Sump, was leaky. This
  
  306   Tuesday, January 03, 2023, 07:42 Adam NewsomeOtherOtherActive SumpActive Sump - Level CheckThe sump level was checked by Robin Swanson
on Dec. 31, 2022. It was essentially empty
- see attached photo.
 2022-12-31.jpg 
  136   Wednesday, January 14, 2015, 15:06 Isaac EarleStandard OperationTarget 1OtherActive Item Stored in East Hot CellThe active item discovered on January 9,
2015 outside the BL1A bootbox has been moved
to the Meson Hall east hot cell for storage.
  
  253   Tuesday, December 17, 2019, 12:39 Isaac EarleStandard OperationOtherOther55 gallon drum and old M9 service stand moved to Rad Waste PitThe following items were moved today from
the Warm Cell to the Rad Waste Pit for long
term storage:
 RWC-55-01-2019.pdfpit_-_before_move.jpgdrum_being_lifted.jpgpit_-_after_move_-_showing_drum.jpgpit_-_after_move_-_showing_service_stand_(bottom_right_with_green_sling).jpg 
  124   Thursday, November 06, 2014, 17:22 Ron KuramotoRepairTarget 2Cooling1AT2, faulty Thermister water out temperture

    

       
            
  
  123   Thursday, November 06, 2014, 17:18 Ron KuramotoRepairTarget 2Cooling1AT2 Collimator B, faulty Thermister water out temperature On 14Oct2014, the 1AT2 Collimator B water
outlet temperature rose to 100o
C. 
  
  122   Thursday, October 16, 2014, 17:44 Ron KuramotoRepairTarget 2Water Leak1A Tunnel T2 Cu-ALCW water leak repair 
 6x 
  121   Thursday, September 11, 2014, 15:36 Ron KuramotoRepairTarget 2Water Leak1A Tunnel T2 Cu-ALCW water leakOn Sep. 3rd
during the 6 hr maintenance day, Doug Preddy
 IMG_1007sm.JPGIMG_1009sm.JPG 