Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall, Page 16 of 18  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tuesday, September 25, 2012, 16:31, Isaac Earle, Repair, Target 1, Target, T1/T2 Controls 
Entry  Thursday, September 13, 2012, 18:09, Isaac Earle, Maintenance, Target 1, Cooling, September Shutdown T1 & T2 MRO IMG_0624.JPGIMG_0658.JPG
Entry  Friday, September 07, 2012, 16:39, Isaac Earle, Repair, Target 1, Target, RH Lab Crane Repaired 
Entry  Friday, September 07, 2012, 16:35, Isaac Earle, Repair, Target 2, Target, T2-MK1 Target Repair Completed 
Entry  Wednesday, August 08, 2012, 14:40, Isaac Earle, Repair, Target 1, Target, T1-MK1 Target Repair Complete 
Entry  Friday, July 27, 2012, 14:48, Isaac Earle, Repair, Target 1, Target, T1-MK1 Target Repair Update 
Entry  Monday, July 23, 2012, 16:01, Isaac Earle, Development, Target 1, Target, Target Flask Seismic Restraint Clamps Installed IMG_0427.JPGIMG_0428.JPGIMG_0429.JPG
Entry  Tuesday, July 17, 2012, 15:30, Isaac Earle, Development, Target 1, Cooling, T1 & T2 Expansion Tank Level Warnings Added 
Entry  Wednesday, July 11, 2012, 17:51, Isaac Earle, Repair, Target 1, Target, T1 Target Swap 
Entry  Monday, July 09, 2012, 17:17, Isaac Earle, Standard Operation, Target 1, Target, BL1A Start-Up Prep 
Entry  Friday, July 06, 2012, 16:03, Isaac Earle, Repair, Target 1, Target, T1-MK2 Target Repair Complete T1MK2_-_July_2012.pdf
Entry  Tuesday, July 03, 2012, 13:23, Isaac Earle, Standard Operation, Target 2, Target, T2 Plug Block Replaced & Beam Blockers Tested 
Entry  Friday, June 29, 2012, 14:18, Isaac Earle, Repair, Target 1, Target, Manipulator Repair Complete 
Entry  Tuesday, June 26, 2012, 09:05, Isaac Earle, Maintenance, Target 1, Cooling, T1 & T2 Target Water Flow Transducers Serviced T1_&_T2_water_flow.jpg
Entry  Friday, June 22, 2012, 13:54, Isaac Earle, Maintenance, Target 2, Target, Air Amplifier Rebuild Complete 
Entry  Friday, June 22, 2012, 13:48, Isaac Earle, Development, Target 1, Cooling, T1 & T2 Expansion Tank Level Sensor Recording Enabled 
Entry  Thursday, June 21, 2012, 13:38, Isaac Earle, Standard Operation, Target 2, Cooling, T2 Water Package Started 
Entry  Monday, June 18, 2012, 16:27, Isaac Earle, Repair, Target 1, Target, T1-MK2 Profile and Protect Monitor Electronics Check 
Entry  Friday, June 08, 2012, 17:01, Isaac Earle, Repair, Target 1, Target, T1-MK2 Leak Repair Update 
Entry  Friday, June 08, 2012, 16:52, Isaac Earle, Repair, Target 1, Target, Broken Manipulator Tape Update 
ELOG V2.9.2-2455