  258   Friday, February 28, 2020, 09:06 Isaac EarleDevelopmentOtherM9M9 Q1Q2 service stand floor plate installed The M9 service stand floor plate
(TB23351) was installed in the M9 pit yesterday. 
Prior to installation all 5 threaded inserts
 M9_service_stand_floor_plate_TB23351.png 
  267   Tuesday, July 07, 2020, 15:13 Isaac EarleDevelopmentOtherM9M9 Q1Q2 service stand Lemo connector wiringThe diagram below shows the wiring for
the two connectors on the service stand (the
wires running from the stand to the power
 Lemo_pin_wiring.PNG 
  266   Tuesday, July 07, 2020, 13:22 Isaac EarleDevelopmentOtherM9M9 Q1Q2 The M9 Q1Q2 magnet assembly lift
beam has been installed according to drawing
TB23401.  The side-to-side as well as
 8.jpg1.jpg4.jpg6.jpg 
  13   Monday, January 23, 2012, 15:27 Isaac EarleRepairTarget 2TargetM20BB returned to beam line. M9BB moved to hot cell.M20 beam blocker was transferred from the
hot cell to the beam line.
M9 beam blocker was transferred from
  
  237   Friday, April 13, 2018, 14:21 Isaac EarleMaintenanceOtherOtherM20 beam blocker MRO and T1/T2 final checksThe M20 beam blocker main shaft seals were
replaced as per the T1/T2 target device maintenance
schedule.  Both air cylinders were found
  
  323   Friday, March 03, 2023, 16:00 Albert KongMaintenanceTarget 2OtherM20 Return to T2 Monolith + Vaccum Leak / T1-T2 Valve Re-inspection We moved M20 back to the T2 monolith
and re did the connections for air + limit
switches + T2 profile monitor air.
 IMG_1755.JPEGIMG_1657.JPEGIMG_1763.jpegScreenshot_2023-03-30_124716.png 
  324   Monday, March 06, 2023, 16:58 Albert KongRepairTarget 2CoolingM20 O-Ring Replacement and Valve Replacement Leak Check We replaced tha O-ring on M20 at
T2 and brought the target station down to
vacuum, which allowed the target water pump
 T1_Mar06_2023.pngT2_Mar06_2023.png 
  319   Tuesday, February 21, 2023, 16:56 Albert KongMaintenanceTarget 2OtherM20 BB moved to meson hall hot cell roofThe M20 beam blocker was moved from the
T2 monolith to the meson hall hot cell with
the remote handling flask (completed ~4pm).
 IMG_1255.JPEG 
  12   Friday, January 20, 2012, 10:23 Isaac EarleRepairTarget 2TargetM20 BB Shaft Bearing ReplacedThe replacement shaft bearing was machined
by Maico Dalla Valle and installed in the
beam blocker.  Smooth operation of the
 P1010788.JPGP1010808.JPG 
  162   Thursday, June 11, 2015, 16:59 Isaac EarleDevelopmentOtherControlsLab Test of New T1/T2 Level SensorsThe new T1/T2 level sensors (Omega LVCN414)
were tested in the RH HC lab today using
the Omega software on a laptop and positioning
  
  3   Friday, November 04, 2011, 13:36 Isaac EarleMaintenanceTarget 2TargetKaon Target (Training)  Moved Kaon Target from storage
pit to remote handling hot cell using flask
as training exercise.  Safety surveyor
  
  288   Thursday, April 14, 2022, 14:38 Adam NewsomeOtherTarget 2DiagnosticsIssue with Protect Monitor SHV CableDiagnostics group (Shengli Liu) noted a
lack of connectivity between control panel
and T2 Protect Monitor via the high voltage
 PXL_20220414_210238000.jpgPXL_20220414_210053641.jpgPXL_20220414_210037717.jpg 
  178   Tuesday, October 06, 2015, 14:04 Isaac EarleOtherOtherControlsInstructions for loading display screen for T1/T2  The following instructions were provided
by Graham Waters:
 
  
  349   Friday, June 28, 2024, 15:44 Albert KongOtherOtherTransfer FlaskInspection of Primary Target Transfer Flask





Normal
0
 Flask_Inspection_Images_(26_June_2024).pdf 
  344   Thursday, February 15, 2024, 12:38 Riley SykesRepairOtherHot CellIndium Extruder Hand PumpFeb 1 2024
Hand Pump observed to be losing pressure
at full extension of cylinder, seals likely
  
  357   Friday, November 29, 2024, 11:57 Adam NewsomeMaintenanceOtherHot CellHot cell and warm cell maintenance tasksThe following maintenance tasks were completed
on 2024-11-29 by A. Newsome, A. Kong, A.
Tam, M. Dalla Valle:
 Operator_left_oil_level_before_refill.jpgOperator_Left_oil_level_after_refill.JPGOperator_right_oil_level.jpgRight_window_water_level_before_refill.jpgWarm_cell_water_window_after_refill.jpg 
  38   Thursday, June 07, 2012, 18:08 Isaac EarleRepairTarget 1TargetHot Cell Manipulator Broken Tape A tape snapped on the west side manipulator
today while working on the T1-MK2 target
repair.  The tape travels through to
  
  32   Monday, April 23, 2012, 09:55 Isaac EarleRepairTarget 1TargetHot Cell Manipulator Broken Cable While working on the leak repair
of the T1-MK2 target in the hot cell on Friday
April 20th, a cable snapped on the slave
  
  296   Wednesday, July 06, 2022, 12:49 Adam NewsomeRepairOtherHot CellHot Cell - Helium wand tubing brokenThe tubing for the helium wand inside the
hot cell is broken and needs to be replaced.
More tubing has been ordered and the job
  
  295   Wednesday, July 06, 2022, 12:49 Matthew GareauRepairOtherOtherHelium line damage, and hotcell window oil leakingToday myself and Adam Newsome started the
leak detection steps for a target exchange
and notice that the Helium line was not connected/broken
  
ELOG V2.9.2-2455