322
|
Thursday, March 02, 2023, 07:04 |
maicodallavalle | Maintenance | Target 2 | Cooling | Refilled Expasion Tank | I have filled the water package on T2 with
DI water. The expansion tank is at 38.1cm.
This may change when the pump is turned on. |
|
|
176
|
Friday, October 02, 2015, 17:25 |
Ron Kuramoto | Standard Operation | Target 1 | Target | Raise Target to lower Rad levels for 1AM7 repair | Today the T1MK2 target was moved from Position
4 to Position 0 to lower the Rad fields for
the 1AM7 repair in the 1A Tunnel. The Rad |
|
|
158
|
Friday, May 01, 2015, 16:01 |
Isaac Earle | Repair | Target 1 | Other | RH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak Check | The Meson Hall RH Lab Warm Cell was used
by Beamlines Group for hydrostatic testing
of the TNF heat exchanger. The location |
|
|
199
|
Friday, April 22, 2016, 14:45 |
Isaac Earle | Other | Other | Active Sump | RH MH Hot Cell Lab Active Sump Water Released | The Remote Handling Hot Cell Lab Active
Sump has been released to city sewer following
the procedure in Document-64834. The |
|
|
203
|
Tuesday, June 28, 2016, 08:32 |
Isaac Earle | Other | Other | Active Sump | RH MH Hot Cell Lab Active Sump Overflow | A call was received from the MCR
at approximately 21:30 on Monday June 27th
to report that active drains in the east |
|
|
204
|
Tuesday, June 28, 2016, 16:28 |
Isaac Earle | Other | Other | Active Sump | RH MH Hot Cell Lab Active Sump High Level Sensor Test | The high level sensor for the Meson
Hall Hot Cell Lab Active Sump was tested
today and worked as expected. When |
|
|
233
|
Thursday, March 22, 2018, 17:24 |
Isaac Earle | Standard Operation | Other | Active Sump | RH Lab active sump released | The RH Lab active sump level reached
the high limit yesterday due to an overflow
of the ultrasonic cleaner in the Rad Waste |
|
|
56
|
Friday, September 07, 2012, 16:39 |
Isaac Earle | Repair | Target 1 | Target | RH Lab Crane Repaired | The "west" button on the
crane pendant was broken, and the crane would
occasionally continue moving west when the |
|
|
275
|
Wednesday, April 14, 2021, 14:30 |
Isaac Earle | Standard Operation | Other | Active Sump | RH Lab Active Sump pumped out | The RH Lab Active Sump reached the
high level sensor at some point overnight
before the April 8th work day. Maico |
|
|
63
|
Thursday, November 22, 2012, 17:22 |
Isaac Earle | Standard Operation | Target 1 | Active Sump | RH Lab Active Sump Released | On Wednesday November 21 at approximately
9am the level of the Remote Handling active
sump was inspected and found to be at approximately |
|
|
89
|
Wednesday, September 25, 2013, 14:05 |
Isaac Earle | Standard Operation | Target 1 | Active Sump | RH Lab Active Sump Level Sensor Inspected | A notification was received that the RH
lab active sump level sensor is due for annual
inspection. The sensor was tested and |
|
|
128
|
Tuesday, November 18, 2014, 10:52 |
Isaac Earle | Standard Operation | Target 1 | Active Sump | RH Hot Cell Lab Active Sump Released | Release of the Remote Handling Hot
Cell Lab active sump water was completed |
|
|
172
|
Monday, September 28, 2015, 10:29 |
Isaac Earle | Standard Operation | Other | Active Sump | RH Hot Cell Lab Active Sump High Level Sensor Tested | The RH hot cell lab active sump high
level sensor was tested as part of the yearly
scheduled inspection. High water level |
|
|
312
|
Monday, January 16, 2023, 15:06 |
Adam Newsome | Repair | Other | Active Sump | RH Active Sump - draining flow rate sensor repair | The flow rate sensor used to monitor the
drain rate from BL1A holding tank to active
sump, located in the active sump area, was |
|
|
19
|
Tuesday, March 06, 2012, 15:27 |
Isaac Earle | Repair | Target 1 | Target | Quick Connect Fittings on T1 Target | The air hoses for the profile monitor
supply line were inspected and no cracking
was found (was found on T2). The quick |
|
|
190
|
Wednesday, March 16, 2016, 16:50 |
Isaac Earle | Development | Target 2 | Controls | Preliminary Testing of T2 Control System Complete | Preliminary testing of the new
PLC control system and EPICS interface was |
|
|
189
|
Monday, March 07, 2016, 18:22 |
Isaac Earle | Development | Target 1 | Controls | Preliminary Testing of T1 Control System Complete | Preliminary testing of the new PLC
control system and EPICS interface was completed
today for the T1 target, T1 cooling package, |
|
|
83
|
Friday, May 31, 2013, 16:07 |
Isaac Earle | Repair | Target 1 | Target | Power Supply Fan Failure | Today (May 31, 2013) I was contacted
regarding a burning smell and high temperatures
around the T1/T2 controls racks. Erwin |
|
|
297
|
Wednesday, July 06, 2022, 12:52 |
Adam Newsome | Other | Other | Hot Cell | Potential hot cell window oil leak | Some oil was noticed around the hot cell
window, on the control panel, and on the
ground below the control panel. A leak is |
|
|
163
|
Friday, June 19, 2015, 17:11 |
Isaac Earle | Development | Other | Controls | PLC Test of Ultrasonic Level Sensor | The new T1/T2 level sensors
(Omega LVCN414) were hooked up to the PLC |
|