  RH-Meson Hall, Page 13 of 18  Not logged in ELOG logo
ID Date Author Category Type Specific Subjectdown Text Attachments
  322   Thursday, March 02, 2023, 07:04 maicodallavalleMaintenanceTarget 2CoolingRefilled Expasion TankI have filled the water package on T2 with
DI water. The expansion tank is at 38.1cm.
This may change when the pump is turned on.
  
  176   Friday, October 02, 2015, 17:25 Ron KuramotoStandard OperationTarget 1TargetRaise Target to lower Rad levels for 1AM7 repairToday the T1MK2 target was moved from Position
4 to Position 0 to lower the Rad fields for
the 1AM7 repair in the 1A Tunnel. The Rad
  
  158   Friday, May 01, 2015, 16:01 Isaac EarleRepairTarget 1OtherRH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak CheckThe Meson Hall RH Lab Warm Cell was used
by Beamlines Group for hydrostatic testing
of the TNF heat exchanger.  The location
 IMG_1510.JPGIMG_1511.JPGIMG_1512.JPG 
  199   Friday, April 22, 2016, 14:45 Isaac EarleOtherOtherActive SumpRH MH Hot Cell Lab Active Sump Water ReleasedThe Remote Handling Hot Cell Lab Active
Sump has been released to city sewer following
the procedure in Document-64834.  The
  
  203   Tuesday, June 28, 2016, 08:32 Isaac EarleOtherOtherActive SumpRH MH Hot Cell Lab Active Sump Overflow A call was received from the MCR
at approximately 21:30 on Monday June 27th
to report that active drains in the east
  
  204   Tuesday, June 28, 2016, 16:28 Isaac EarleOtherOtherActive SumpRH MH Hot Cell Lab Active Sump High Level Sensor Test The high level sensor for the Meson
Hall Hot Cell Lab Active Sump was tested
today and worked as expected.  When
  
  233   Thursday, March 22, 2018, 17:24 Isaac EarleStandard OperationOtherActive SumpRH Lab active sump released The RH Lab active sump level reached
the high limit yesterday due to an overflow
of the ultrasonic cleaner in the Rad Waste
  
  56   Friday, September 07, 2012, 16:39 Isaac EarleRepairTarget 1TargetRH Lab Crane Repaired The "west" button on the
crane pendant was broken, and the crane would
occasionally continue moving west when the
  
  275   Wednesday, April 14, 2021, 14:30 Isaac EarleStandard OperationOtherActive SumpRH Lab Active Sump pumped out The RH Lab Active Sump reached the
high level sensor at some point overnight
before the April 8th work day.  Maico
  
  63   Thursday, November 22, 2012, 17:22 Isaac EarleStandard OperationTarget 1Active SumpRH Lab Active Sump Released On Wednesday November 21 at approximately
9am the level of the Remote Handling active
sump was inspected and found to be at approximately
  
  89   Wednesday, September 25, 2013, 14:05 Isaac EarleStandard OperationTarget 1Active SumpRH Lab Active Sump Level Sensor InspectedA notification was received that the RH
lab active sump level sensor is due for annual
inspection.  The sensor was tested and
  
  128   Tuesday, November 18, 2014, 10:52 Isaac EarleStandard OperationTarget 1Active SumpRH Hot Cell Lab Active Sump ReleasedRelease of the Remote Handling Hot
Cell Lab active sump water was completed
  
  172   Monday, September 28, 2015, 10:29 Isaac EarleStandard OperationOtherActive SumpRH Hot Cell Lab Active Sump High Level Sensor Tested The RH hot cell lab active sump high
level sensor was tested as part of the yearly
scheduled inspection.  High water level
  
  312   Monday, January 16, 2023, 15:06 Adam NewsomeRepairOtherActive SumpRH Active Sump - draining flow rate sensor repairThe flow rate sensor used to monitor the
drain rate from BL1A holding tank to active
sump, located in the active sump area, was
  
  19   Tuesday, March 06, 2012, 15:27 Isaac EarleRepairTarget 1TargetQuick Connect Fittings on T1 Target The air hoses for the profile monitor
supply line were inspected and no cracking
was found (was found on T2).  The quick
  
  190   Wednesday, March 16, 2016, 16:50 Isaac EarleDevelopmentTarget 2ControlsPreliminary Testing of T2 Control System CompletePreliminary testing of the new
PLC control system and EPICS interface was
 T2_Testing_Checklist_-_Complete_-_March_16_2016.pdf 
  189   Monday, March 07, 2016, 18:22 Isaac EarleDevelopmentTarget 1ControlsPreliminary Testing of T1 Control System Complete Preliminary testing of the new PLC
control system and EPICS interface was completed
today for the T1 target, T1 cooling package,
 T1_Testing_Checklist_-_Complete_-_March_7_2016.pdf 
  83   Friday, May 31, 2013, 16:07 Isaac EarleRepairTarget 1TargetPower Supply Fan Failure Today (May 31, 2013) I was contacted
regarding a burning smell and high temperatures
around the T1/T2 controls racks.  Erwin
 IMG_1440.JPGIMG_1441.JPGIMG_1442.JPG 
  297   Wednesday, July 06, 2022, 12:52 Adam NewsomeOtherOtherHot CellPotential hot cell window oil leakSome oil was noticed around the hot cell
window, on the control panel, and on the
ground below the control panel. A leak is
  
  163   Friday, June 19, 2015, 17:11 Isaac EarleDevelopmentOtherControlsPLC Test of Ultrasonic Level SensorThe new T1/T2 level sensors
(Omega LVCN414) were hooked up to the PLC
 Overnight_Level_Sensor_PLC_Test.jpg 