  RH-Meson Hall, Page 11 of 18  Not logged in ELOG logo
Entry  Friday, May 01, 2015, 16:01, Isaac Earle, Repair, Target 1, Other, RH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak Check IMG_1510.JPGIMG_1511.JPGIMG_1512.JPG
Entry  Tuesday, April 28, 2015, 15:55, Isaac Earle, Development, Target 1, Target, Target Version Jumper Wires Installed for T1-MK1 and T2-MK1 
Entry  Friday, April 24, 2015, 11:53, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Target Info Sheet & Elevations T2-MK2_-_2015_Elevations.pdf
Entry  Thursday, April 23, 2015, 16:29, Isaac Earle, Standard Operation, Target 1, Target, T1 & T2 Profile and Protect Monitors Electrical Check Completed 
Entry  Thursday, April 23, 2015, 13:40, Isaac Earle, Development, Target 2, Other, T2 Protect Monitor Elevation Adjustment Old_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Entry_Side.jpgOld_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Exit_Side.jpg
Entry  Wednesday, April 22, 2015, 15:17, Isaac Earle, Development, Target 1, Target, T1-MK2 wired for version identification 
Entry  Wednesday, April 22, 2015, 15:15, Isaac Earle, Standard Operation, Target 1, Cooling, T1 and T2 Cooling Packages Ready 
Entry  Wednesday, April 22, 2015, 09:46, Isaac Earle, Development, Target 1, Target, Water Sensors Installed on T1 Monolith T1_Water_Sensors.jpgIMG_4859.JPGIMG_4860.JPG
Entry  Tuesday, April 21, 2015, 13:38, Isaac Earle, Standard Operation, Target 1, Target, Air Amplifier Started. T1 & T2 Profile Monitor Actuation Checked 
Entry  Tuesday, April 21, 2015, 12:59, Isaac Earle, Standard Operation, Target 1, Target, T1-MK2 target moved from storage pit to beam line 
Entry  Monday, April 20, 2015, 11:42, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Target & T2 Protect Moved 
Entry  Thursday, April 09, 2015, 13:56, Isaac Earle, Development, Target 2, Target, T2-MK2 target wired for version identification, cable ties replaced, ready for use 
Entry  Tuesday, March 31, 2015, 17:40, Isaac Earle, Repair, Target 2, Cooling, T2 Thermistors Replaced 
Entry  Thursday, March 12, 2015, 10:51, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Pos'n 4 Elevation Measurements 
Entry  Wednesday, March 04, 2015, 18:08, Isaac Earle, Repair, Target 2, Cooling, T2 Cooling Package MRO Update 
Entry  Friday, February 27, 2015, 18:06, Isaac Earle, Development, Target 1, Target, T1 Rotary Collimator Water and Air Line Investigation 
Entry  Friday, February 20, 2015, 13:55, Isaac Earle, Standard Operation, Target 2, Target, T1 & T2 Target Moves 
Entry  Wednesday, February 18, 2015, 14:49, Isaac Earle, Repair, Target 1, Target, T1-MK1 Repair Complete IMG_4638.JPGIMG_4646.JPGIMG_4647.JPG
Entry  Friday, February 06, 2015, 12:39, Isaac Earle, Repair, Target 1, Target, T1-MK1 Repair Status (Pos'n 1 Plug Leak) IMG_4603.JPG
Entry  Monday, February 02, 2015, 16:06, Isaac Earle, Maintenance, Target 2, Cooling, T2 MRO Status 