515
|
Monday, October 21, 2013, 12:29 |
Bevan Moss | Conditioning Station | Repair | TM4 | | BIAS Canbus | There is something wrong with the
BIAS canbus controller. It says that it is
not alive and has timed out. I have tried |
|
|
519
|
Tuesday, October 22, 2013, 17:04 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | HV testing | This afternoon TM4 with the coil
removed was tested with HV. The EINZEL LENS
was first tested independently while the |
|
|
524
|
Thursday, October 24, 2013, 11:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the conditioning station to the south hot
cell. |
|
|
525
|
Thursday, October 24, 2013, 15:43 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance | The conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful |
|
|
526
|
Thursday, October 24, 2013, 15:54 |
Grant Minor | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
|
527
|
Friday, October 25, 2013, 06:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 target heat shield | Maico and I leak checked HS circuit after
Chad installed the target. The circuit was
a little bit difficult o pump down because |
|
|
528
|
Friday, October 25, 2013, 10:26 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#41 | module move | TM#4 with Ta#41 has been moved from the
south hot cell to the west target station. |
|
|
530
|
Friday, October 25, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
|
531
|
Thursday, October 31, 2013, 10:36 |
David Wang | ITW | Standard Operation | TM4 | | I moved 5 shielding blocks from ITE to ITW. | I moved 5 shielding blocks from ITW to
ITE. The ITW is configured to take
proton beam. |
|
|
563
|
Tuesday, December 03, 2013, 09:58 |
David Wang | ITW | Standard Operation | TM4 | | I moved 5 shielding blocks from ITW to block storage area. | I moved 5 shielding blocks from ITW to
block storage area. |
|
|
566
|
Wednesday, December 04, 2013, 10:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | module move | TM#4 with Ta#41 has moved to the south
hot cell, the move it self was uneventful
but, the fields on the module are extremely |
|
|
567
|
Wednesday, December 04, 2013, 11:05 |
David Wang | ITW | Standard Operation | TM4 | Ta41# | I disconnected TM4 in ITW | I disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose. |
|
|
568
|
Wednesday, December 04, 2013, 11:15 |
David Wang | ITE | Repair | TM4 | | New bolts are installed on ITE TP3. | I installed 8 new bolts(3/8-16 UNC x1.25
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back |
|
|
569
|
Wednesday, December 04, 2013, 13:57 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta #47 | Ta #47 Removed - broken bolt | Ta #47 has been removed from TM4.
One containment box cover bolt would
not come out. Upon attempted removal with |
|
|
570
|
Wednesday, December 04, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Electrical check | Electrical check of TM#4 with Ta#41 post
beam at the south hot cell. See PDF for details |
|
|
571
|
Thursday, December 05, 2013, 12:04 |
Travis Cave | ITE | Standard Operation | TM4 | UC#8 | module move | TM#4 with UC#8 has been moved from the
south hot cell to the east target station. |
|
|
572
|
Thursday, December 05, 2013, 12:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#8 and no target | Electrical check | Electrical check was done on TM#4 without
a target and with the UC#8 target on see
attached PDF for results. |
|
|
573
|
Thursday, December 05, 2013, 14:55 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 target heat shield | Chad and I leak checked TM4 heat shied
water circuit at SHC. The pumping down was
very good.Base leak rate 0.0xe-9 atm.cc/sec. |
|
|
574
|
Thursday, December 05, 2013, 14:57 |
David Wang | ITE | Standard Operation | TM4 | | Connected TM4 in ITW | I connected TM4 in ITE. All turbo pumps
have been started and wok fine including
new TP3. Everything is good so far. |
|
|
577
|
Monday, December 09, 2013, 14:47 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks from block storage area to ITE. | I moved 5 shielding blocks to ITE. The