Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 572     Entry time: Thursday, December 05, 2013, 12:51
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#8 and no target 
Subject: Electrical check 

Electrical check was done on TM#4 without a target and with the UC#8 target on see attached PDF for results.

Attachment 1: TM#4_UC8_electest_SHC.PDF  400 kB  | Show | Hide all
Attachment 2: TM#4_notarget_electest_SHC.PDF  327 kB  | Show | Hide all
ELOG V2.9.2-2455