Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 570     Entry time: Wednesday, December 04, 2013, 14:09
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#41 
Subject: Electrical check 

Electrical check of TM#4 with Ta#41 post beam at the south hot cell. See PDF for details

Attachment 1: TM#4_Ta41_electest_SHC_PostBeam.PDF  239 kB  | Show | Hide all
ELOG V2.9.2-2455