Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 9 of 138  Not logged in ELOG logo
  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  515   Monday, October 21, 2013, 12:29 Bevan MossConditioning StationRepairTM4 BIAS Canbus There is something wrong with the
BIAS canbus controller. It says that it is
not alive and has timed out. I have tried
  
  519   Tuesday, October 22, 2013, 17:04 Bevan MossConditioning StationStandard OperationTM4 HV testing This afternoon TM4 with the coil
removed was tested with HV. The EINZEL LENS
was first tested independently while the
 22102013_TM4_Coil_removed_EL_testing_(1).txt 
  524   Thursday, October 24, 2013, 11:32 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the conditioning station to the south hot
cell.
  
  525   Thursday, October 24, 2013, 15:43 Anders MjosSouth Hot-CellStandard OperationTM4Ta#41Target conductanceThe conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful
 Ta#41_electrical_measurement_TGHT_in_SHC.pdf 
  526   Thursday, October 24, 2013, 15:54 Grant MinorSouth Hot-CellStandard OperationTM4Ta#41Target conductance

    

       
            
  
  527   Friday, October 25, 2013, 06:58 David WangSouth Hot-CellStandard OperationTM4 Leak check on TM4 target heat shieldMaico and I leak checked HS circuit after
Chad installed the target. The circuit was
a little bit difficult o pump down because
  
  528   Friday, October 25, 2013, 10:26 Travis CaveITWStandard OperationTM4Ta#41module moveTM#4 with Ta#41 has been moved from the
south hot cell to the west target station.
  
  530   Friday, October 25, 2013, 14:09 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41Target conductance

    

       
            
 TM#4_Ta#41_elec_test_SHC.PDF 
  531   Thursday, October 31, 2013, 10:36 David WangITWStandard OperationTM4 I moved 5 shielding blocks from ITE to ITW.I moved 5 shielding blocks from ITW to
ITE. The ITW  is configured to take
proton beam.
  
  563   Tuesday, December 03, 2013, 09:58 David WangITWStandard OperationTM4 I moved 5 shielding blocks from ITW to block storage area.I moved 5 shielding blocks from ITW to
block storage area.
  
  566   Wednesday, December 04, 2013, 10:44 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41module moveTM#4 with Ta#41 has moved to the south
hot cell, the move it self was uneventful
but, the fields on the module are extremely
  
  567   Wednesday, December 04, 2013, 11:05 David WangITWStandard OperationTM4Ta41#I disconnected TM4 in ITWI disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose.
  
  568   Wednesday, December 04, 2013, 11:15 David WangITERepairTM4 New bolts are installed on ITE TP3.I installed 8 new bolts(3/8-16 UNC x1.25 
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back
  
  569   Wednesday, December 04, 2013, 13:57 chad fisherSouth Hot-CellStandard OperationTM4Ta #47Ta #47 Removed - broken boltTa #47 has been removed from TM4.
One containment box cover bolt would
not come out. Upon attempted removal with
  
  570   Wednesday, December 04, 2013, 14:09 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41Electrical checkElectrical check of TM#4 with Ta#41 post
beam at the south hot cell. See PDF for details
 TM#4_Ta41_electest_SHC_PostBeam.PDF 
  571   Thursday, December 05, 2013, 12:04 Travis CaveITEStandard OperationTM4UC#8module moveTM#4 with UC#8 has been moved from the
south hot cell to the east target station.
  
  572   Thursday, December 05, 2013, 12:51 Travis CaveSouth Hot-CellStandard OperationTM4UC#8 and no targetElectrical checkElectrical check was done on TM#4 without
a target and with the UC#8 target on see
attached PDF for results.
 TM#4_UC8_electest_SHC.PDFTM#4_notarget_electest_SHC.PDF 
  573   Thursday, December 05, 2013, 14:55 David WangSouth Hot-CellStandard OperationTM4 Leak check on TM4 target heat shieldChad and I leak checked TM4 heat shied
water circuit at SHC. The pumping down was
very good.Base leak rate 0.0xe-9 atm.cc/sec.
  
  574   Thursday, December 05, 2013, 14:57 David WangITEStandard OperationTM4  Connected TM4 in ITWI connected TM4 in ITE. All turbo pumps
have been started and wok fine including
new TP3. Everything is good so far.
  
  577   Monday, December 09, 2013, 14:47 David WangITEStandard OperationTM4 I moved 5 shielding blocks from block storage area to ITE.I moved 5 shielding blocks to ITE. The
ITE is configured to take proton beam.
  
ELOG V2.9.2-2455