  166   Friday, August 31, 2012, 12:10 chad fisherSouth Hot-CellMaintenance  Hot Cell MaitenanceEntered south hot cell Wednesday and replaced
the pre-filter air filter as well as the
front two light bulbs. Also removed two bags
  
  173   Friday, September 07, 2012, 09:47 Travis CaveSpent Target VaultStandard Operation UO#3Spent target moveThe spent UO#3 was moved from the south
hot cell to the storage vault. It was in
pail 98 and placed in spot 1A of the vault,
 Vault_Storage_September_6_2012.pdf 
  179   Friday, September 14, 2012, 10:45 Travis CaveSpent Target VaultStandard Operation UCx#4Spent target moveUCx#4 has been moved from the south hot
cell to the spent target vault. The target
was placed in pail #99 and now resides in
 Vault_Storage_September_14_2012.pdf 
  191   Thursday, October 04, 2012, 11:06 David WangConditioning StationRepair  Replace conditioning station scroll pump in target hallGrant and I replaced the conditioning station
broken  srcoll pump with a refurbished
scroll pump which is supplied by vacuum group.
  
  198   Wednesday, October 24, 2012, 11:53 Travis CaveSpent Target VaultStandard Operation NiO#1Spent target moveThe NiO #1 spent target was placed into
storage today. It is in pail number 01 (101
on Vault Status page) and located in slot
 Vault_Storage_October_24_2012.pdf 
  200   Friday, November 02, 2012, 08:45 maicodallavalleSpent Target VaultMaintenance  F-308The F-308 have been cleaned and serviced.
There were three F-308's that came back with
some contamination.#13, #15 and #19 were
  
  201   Friday, November 02, 2012, 13:18 Travis CaveSpent Target VaultStandard Operation  spent target assayThis week six targets and the two source
trays were assayed and surveyed from the
storage vault. see attached PDF for details.
 Vault_Storage_November_2_2012.pdf 
  212   Friday, November 09, 2012, 14:35 Travis CaveSpent Target VaultStandard Operation Nb#7Spent target moveNb#7 was moved from the south hot cell
to the target storage vault. The target was
placed in pail #103 in slot 6A of the vault
 Vault_Storage_November_9_2012.pdf 
  216   Wednesday, November 14, 2012, 11:51 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Five spent targets have been moved from
the storage vault to the mini storage vault.
The five targets are as follows: SiC #25,
 Vault_Storage_November_14_2012.pdfMini_Vault_Storage_November_14_2012.pdf 
  217   Wednesday, November 21, 2012, 09:36 Travis CaveSpent Target VaultStandard Operation  Spent target moveOn Nov 20th the 5 targets in mini storage
have been moved to the F-308s, those F-308s
have since been moved to the hot cell ante
  
  223   Wednesday, December 05, 2012, 15:53 Anders MjosSouth Hot-CellStandard Operation UCx#5Target inspection - target tube brokenThe target was inspected today.
It was found that the target tube
had broken on both sides of the centre block
  
  224   Thursday, December 06, 2012, 08:57 Travis CaveSpent Target VaultStandard Operation UCx#5Spent target moveUCx #5 has been moved from the south hot
cell to the storage vault. It is in Pail
102, in spot 2A of the vault and had a field
 Vault_Storage_December_6_2012.pdf 
  229   Thursday, January 10, 2013, 10:40 David WangITWMaintenance  Replaced all high active water system magnetic pedal wheels in ITW and ITE.I replaced all high active water system
magnetic pedal wheels in ITW and ITE. This
is a preventive maintenance job we planned
  
  232   Tuesday, January 15, 2013, 14:37 Travis CaveSpent Target VaultStandard Operation TiC#3Spent target moveTiC #3 was moved from the south hot cell
in to the vault storage today, it was placed
in slot 4B and was in pail #104, it had a
 Vault_Storage_January_15_2013.pdf 
  233   Thursday, January 17, 2013, 10:06 chad fisherSouth Hot-CellStandard Operation  SiC Test Target for TM4/CSI have inserted the test target for TM4
and the CS into the hot cell.
I had some concerns about the condition
 16x 
  241   Monday, January 28, 2013, 12:26 Travis CaveConditioning StationDevelopment  Switches connectedthe switches and the solenoid are all wire
up to 24VDC, when you open either of the
little doors the solenoid switches this is
  
  243   Friday, February 08, 2013, 11:42 Grant MinorITEMaintenance  TAPC 477 resolved - ISAC elec. room gas cylinderSee attached TAPC 477 documentation.  TAPC-477_resolved_8Feb2013.pdf 
  244   Thursday, February 14, 2013, 09:31 David WangITWRepair  ITH MP1 is replaced.Edi and I replaced the broken ITH MP1 in
target hall with a new pump. The old pump
was leak on oil. There were no oil had been
  
  252   Wednesday, March 06, 2013, 10:09 Travis CaveITWMaintenance  module moveITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station.
  
  253   Wednesday, March 06, 2013, 12:50 Travis CaveSouth Hot-CellMaintenance  module moveITW EX1 have been moved back to the west
target station from the south hot cell.
  