Message ID: 103     Entry time: Wednesday, May 16, 2012, 10:35
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: SiC#26 
Subject: Spent target move 

SiC #26 was moved from the south hot cell into storage today. The target was is in pail # 94 and was placed in slot 1B in the storage vault. The fields of the pail at the hot cell were 118mSv/hr upon pail been removed from the hot cell. Attached is the current status of the storage vault.