Message ID: 49     Entry time: Thursday, November 10, 2011, 14:33
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Spent Target Assay 

For the week of November 7th 2011, four of a possible ten targets that are in storage were assayed. Targets are as follows:

Target             General average field @ 1 metre from edge of pail

SiC#24           1.99 mSv/hr

Nb#4               3.89 mSv/hr

Ta#25              4.57 mSv/hr

Ta#37              0.47 mSv/hr

 

These four are all viable spent targets to be shipped. We still need another couple of days of "UNINTERRUPTED" time to assay the remaining six targets, for us to have enough to make a ship of five to Chalk River.