For the week of November 7th 2011, four of a possible ten targets that are in storage were assayed. Targets are as follows:
Target General average field @ 1 metre from edge of pail
SiC#24 1.99 mSv/hr
Nb#4 3.89 mSv/hr
Ta#25 4.57 mSv/hr
Ta#37 0.47 mSv/hr
These four are all viable spent targets to be shipped. We still need another couple of days of "UNINTERRUPTED" time to assay the remaining six targets, for us to have enough to make a ship of five to Chalk River. |