Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 113     Entry time: Friday, May 25, 2012, 10:48
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Moving the spent targets to mini storage. 

Five targets were moved to the mini storage today in preparation for transfer of the targets to the F308s later next week. The moves went well. See the attached files for the vault and mini storage details.

Attachment 1: Mini_Vault_Storage_May_25_2012.pdf  44 kB  | Show | Hide all
Attachment 2: Vault_Storage_May_25_2012.pdf  50 kB  | Show | Hide all
ELOG V2.9.2-2455