Entry  Monday, October 07, 2019, 14:03, David Wang, ITE, Standard Operation, TM2, Ta 59, TM2 has been connected in ITE. Ta_59_TM2_ITE__connection_checklist..pdf

Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist

Entry  Wednesday, October 23, 2019, 06:56, David Wang, ITW, Standard Operation, TM4, UCX 28, TM4 UCx 28 disconnection checklist UCx_28_disonnection_CL.pdf

TM4 was disconnected in ITW.  See checklist.

Entry  Friday, October 25, 2019, 06:43, David Wang, Safe Module Parking, Development, TM3, , SMP vacuum 

TM3 was moved into SMP Oct 25 morning.  After two nights pumping down, SMP CG1 read 30mtorr this morning.  The pump is stopped. SMP will be vented soon for TM3 moving back to silo. 

Entry  Wednesday, October 30, 2019, 11:18, David Wang, ITW, Standard Operation, TM4, UCx 29, UCx 29 connection checklist UCx_29_connection_checklist.pdf

See attachment

Entry  Thursday, October 31, 2019, 10:17, David Wang, Assembly/Bench Test, Maintenance, TM2, , Febiad target gas line leak check. 

Feibiad gas line for ITE and its adapter fittings for TM2 are tested today by installing them on a dummy water stem. No leak on VCO fitting, adapter o-rings, and all Swagelock fittings of this assembly. Manual valve on gas line works fine.  The positional check on gas line between TM2 and ITW will be fulfilled next Tuesday during module disconnection. 

Entry  Tuesday, November 05, 2019, 11:57, David Wang, ITE, Standard Operation, TM2, Ta 59, Ta#59 disconnection checklist Ta#59_disconnection_checklist.pdf

See attachment

Entry  Thursday, November 07, 2019, 08:56, David Wang, Conditioning Station, Standard Operation, TM2, SiC#38, TM2 in TCS. 

Helium pressure leak check on TM2 HS line at TCS is done. No leak. Also, Helium are sprayed to gas line adapter and fittings. No leak. TM2 is connected at TCS. Anode plug on TCS is connected to module 52pin connector. Water system is started. Vacuum pumping down is good. HV cover will be installed today.

Entry  Tuesday, November 19, 2019, 13:41, David Wang, ITE, Standard Operation, TM2, SiC 38# febiad, TM2 SiC#38 connection check list. SiC_#_38_febiad_connection_checklist.pdf

TM2 was connected in ITE 12th Nov. attach checklist

Entry  Wednesday, November 27, 2019, 13:46, David Wang, Conditioning Station, Standard Operation, TM2, SiC 38# febiad, TM2 SiC #38 disconnection checklist. SiC_#_38_febiad_disconnection_checklist.pdf

TM2 was disconnected in ITE yesterday.

Entry  Friday, November 29, 2019, 13:10, David Wang, ITE, Standard Operation, TM2, SiC 39# febiad, TM2 SiC#39 connection check list. SiC_#_39_febiad_connection_checklist.pdf

TM2 has been connected  in ITE.  All turbo-pumps are started.

Entry  Thursday, January 02, 2020, 09:55, David Wang, Cooling, Standard Operation, , , I turned on HALC water pump MP2. 

HALCW MP2 is switched onnow. There is a small amount of air trapped in system. The pump works fine.  Water level and system resistivity will be monitored for a while.

LALCW P5 and P6 are switched on  for cooling HALCW.  HALCW MP2 is in operation now.

Entry  Thursday, January 02, 2020, 10:10, David Wang, Crane, Standard Operation, , , TH crane issue. 

Target hall crane does not work properly after TH crane main power is switched off during Christmas time in control room. I switched the main power back this morning. The only movement could be operated is crane rotation. Power is supplied crane. The control  on N-S, E-W and up-down movements do not work. We had the same problem last year. After trouble shooting, It was pointed to a PLC battery issue. Control group changed the battery and reloaded the program. I guess  the battery is drained out very fast for some reason. So, We face the same problem again this year.

Adam checked control room main power supply. I checked in TH crane again. The problem is still there. We can confirm this is the same issue like last year. 

Entry  Tuesday, January 07, 2020, 08:02, David Wang, Cooling, Standard Operation, , , Switch on HALCW MP2 

HALCW MP2 is switched on this morning after yesterday cooling tower maintenance. LALCW P5 and P6 pumps are started by isac operator  as well. The system is good so far.

Entry  Tuesday, January 07, 2020, 09:37, David Wang, ITW, Standard Operation, , , 5 shielding blocks are moved out of ITW top. 

5 shielding blocks are moved out of itw top.

Entry  Wednesday, January 08, 2020, 10:34, David Wang, Assembly/Bench Test, Development, , , Module lifting assembly ITA0490 

The second module lifting assembly ITA0490 is moved into TH and installed onto TM3 . It will stay with TM3. I adjusted the  CofG on the assembly. It is same to the first lifting assembly we are using now. After adjustment, The installation of assembly on TM3 are smooth. 

Entry  Thursday, January 09, 2020, 14:14, David Wang, Conditioning Station, Standard Operation, TM3, , Start of TCS roughing pump for TM3. 

I started TCS roughing pump. TM3 TP1 and TP2 will be started tomorrow morning.

Entry  Friday, January 10, 2020, 10:26, David Wang, ITE, Standard Operation, , , ITE water signal inerlock check. 

ITE water  signal interlock   check is done.  Everything is good. It is a annual check we do in winter shut down time.

Entry  Tuesday, January 14, 2020, 10:12, David Wang, Conditioning Station, Standard Operation, TM3, , Helium spray leak check on TCS. 

Using a long pole with a probe to spray helium on TCS vacuum seals and joints which are installed in  TCS service pit. No response has been found on leak detector during leak check. TCS is leak free.

Entry  Tuesday, January 14, 2020, 10:19, David Wang, Conditioning Station, Standard Operation, TM3, , TCS vacuum system is switched off.  

TM3 TP1 and TP2 work  fine in past 4 days. During operation, The current draw on pumps were 0.7A to 0.8 A. TM3 will be moved back to silo tomorrow.

Entry  Friday, January 24, 2020, 08:19, David Wang, ITW, Standard Operation, TM4, , ITW water signal interlock check. 

ITW water signal interlock check is done. Everything works fine. ITW 2A2 tank water signal is broken and is not ok on XT2A2  page. I will fix it next week.