Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2014     Entry time: Friday, October 25, 2019, 06:43
Author: David Wang 
Category: Safe Module Parking 
Type: Development 
Module: TM3 
Target/Number:  
Subject: SMP vacuum 

TM3 was moved into SMP Oct 25 morning.  After two nights pumping down, SMP CG1 read 30mtorr this morning.  The pump is stopped. SMP will be vented soon for TM3 moving back to silo. 

ELOG V2.9.2-2455