  2003   Monday, October 07, 2019, 14:03 David WangITEStandard OperationTM2Ta 59TM2 has been connected in ITE.

Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist

Attachment 1: Ta_59_TM2_ITE__connection_checklist..pdf
Ta_59_TM2_ITE__connection_checklist..pdf Ta_59_TM2_ITE__connection_checklist..pdf Ta_59_TM2_ITE__connection_checklist..pdf
  2011   Wednesday, October 23, 2019, 06:56 David WangITWStandard OperationTM4UCX 28TM4 UCx 28 disconnection checklist

TM4 was disconnected in ITW.  See checklist.

Attachment 1: UCx_28_disonnection_CL.pdf
UCx_28_disonnection_CL.pdf UCx_28_disonnection_CL.pdf
  2014   Friday, October 25, 2019, 06:43 David WangSafe Module ParkingDevelopmentTM3 SMP vacuum

TM3 was moved into SMP Oct 25 morning.  After two nights pumping down, SMP CG1 read 30mtorr this morning.  The pump is stopped. SMP will be vented soon for TM3 moving back to silo. 

  2018   Wednesday, October 30, 2019, 11:18 David WangITWStandard OperationTM4UCx 29UCx 29 connection checklist

See attachment

Attachment 1: UCx_29_connection_checklist.pdf
UCx_29_connection_checklist.pdf UCx_29_connection_checklist.pdf UCx_29_connection_checklist.pdf
  2020   Thursday, October 31, 2019, 10:17 David WangAssembly/Bench TestMaintenanceTM2 Febiad target gas line leak check.

Feibiad gas line for ITE and its adapter fittings for TM2 are tested today by installing them on a dummy water stem. No leak on VCO fitting, adapter o-rings, and all Swagelock fittings of this assembly. Manual valve on gas line works fine.  The positional check on gas line between TM2 and ITW will be fulfilled next Tuesday during module disconnection. 

  2022   Tuesday, November 05, 2019, 11:57 David WangITEStandard OperationTM2Ta 59Ta#59 disconnection checklist

See attachment

Attachment 1: Ta#59_disconnection_checklist.pdf
Ta#59_disconnection_checklist.pdf Ta#59_disconnection_checklist.pdf Ta#59_disconnection_checklist.pdf
  2025   Thursday, November 07, 2019, 08:56 David WangConditioning StationStandard OperationTM2SiC#38TM2 in TCS.

Helium pressure leak check on TM2 HS line at TCS is done. No leak. Also, Helium are sprayed to gas line adapter and fittings. No leak. TM2 is connected at TCS. Anode plug on TCS is connected to module 52pin connector. Water system is started. Vacuum pumping down is good. HV cover will be installed today.

  2030   Tuesday, November 19, 2019, 13:41 David WangITEStandard OperationTM2SiC 38# febiadTM2 SiC#38 connection check list.

TM2 was connected in ITE 12th Nov. attach checklist

Attachment 1: SiC_#_38_febiad_connection_checklist.pdf
SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf
  2032   Wednesday, November 27, 2019, 13:46 David WangConditioning StationStandard OperationTM2SiC 38# febiadTM2 SiC #38 disconnection checklist.

TM2 was disconnected in ITE yesterday.

Attachment 1: SiC_#_38_febiad_disconnection_checklist.pdf
SiC_#_38_febiad_disconnection_checklist.pdf SiC_#_38_febiad_disconnection_checklist.pdf SiC_#_38_febiad_disconnection_checklist.pdf
  2035   Friday, November 29, 2019, 13:10 David WangITEStandard OperationTM2SiC 39# febiadTM2 SiC#39 connection check list.

TM2 has been connected  in ITE.  All turbo-pumps are started.

Attachment 1: SiC_#_39_febiad_connection_checklist.pdf
SiC_#_39_febiad_connection_checklist.pdf SiC_#_39_febiad_connection_checklist.pdf SiC_#_39_febiad_connection_checklist.pdf SiC_#_39_febiad_connection_checklist.pdf
  2038   Thursday, January 02, 2020, 09:55 David WangCoolingStandard Operation  I turned on HALC water pump MP2.

HALCW MP2 is switched onnow. There is a small amount of air trapped in system. The pump works fine.  Water level and system resistivity will be monitored for a while.

LALCW P5 and P6 are switched on  for cooling HALCW.  HALCW MP2 is in operation now.

  2039   Thursday, January 02, 2020, 10:10 David WangCraneStandard Operation  TH crane issue.

Target hall crane does not work properly after TH crane main power is switched off during Christmas time in control room. I switched the main power back this morning. The only movement could be operated is crane rotation. Power is supplied crane. The control  on N-S, E-W and up-down movements do not work. We had the same problem last year. After trouble shooting, It was pointed to a PLC battery issue. Control group changed the battery and reloaded the program. I guess  the battery is drained out very fast for some reason. So, We face the same problem again this year.

Adam checked control room main power supply. I checked in TH crane again. The problem is still there. We can confirm this is the same issue like last year. 

  2041   Tuesday, January 07, 2020, 08:02 David WangCoolingStandard Operation  Switch on HALCW MP2

HALCW MP2 is switched on this morning after yesterday cooling tower maintenance. LALCW P5 and P6 pumps are started by isac operator  as well. The system is good so far.

  2042   Tuesday, January 07, 2020, 09:37 David WangITWStandard Operation  5 shielding blocks are moved out of ITW top.

5 shielding blocks are moved out of itw top.

  2043   Wednesday, January 08, 2020, 10:34 David WangAssembly/Bench TestDevelopment  Module lifting assembly ITA0490

The second module lifting assembly ITA0490 is moved into TH and installed onto TM3 . It will stay with TM3. I adjusted the  CofG on the assembly. It is same to the first lifting assembly we are using now. After adjustment, The installation of assembly on TM3 are smooth. 

  2045   Thursday, January 09, 2020, 14:14 David WangConditioning StationStandard OperationTM3 Start of TCS roughing pump for TM3.

I started TCS roughing pump. TM3 TP1 and TP2 will be started tomorrow morning.

  2046   Friday, January 10, 2020, 10:26 David WangITEStandard Operation  ITE water signal inerlock check.

ITE water  signal interlock   check is done.  Everything is good. It is a annual check we do in winter shut down time.

  2048   Tuesday, January 14, 2020, 10:12 David WangConditioning StationStandard OperationTM3 Helium spray leak check on TCS.

Using a long pole with a probe to spray helium on TCS vacuum seals and joints which are installed in  TCS service pit. No response has been found on leak detector during leak check. TCS is leak free.

  2049   Tuesday, January 14, 2020, 10:19 David WangConditioning StationStandard OperationTM3 TCS vacuum system is switched off.

TM3 TP1 and TP2 work  fine in past 4 days. During operation, The current draw on pumps were 0.7A to 0.8 A. TM3 will be moved back to silo tomorrow.

  2051   Friday, January 24, 2020, 08:19 David WangITWStandard OperationTM4 ITW water signal interlock check.

ITW water signal interlock check is done. Everything works fine. ITW 2A2 tank water signal is broken and is not ok on XT2A2  page. I will fix it next week.