818
|
Monday, December 08, 2014, 15:22 |
Anders Mjos | Conditioning Station | Development | TM2 | | Circuit D water test | Monday, December 08, 2014, 14:00: Dan M
and Anders connected the water supply to
circuit D and installed the module cover. |
|
|
817
|
Monday, December 08, 2014, 13:52 |
Anders Mjos | Conditioning Station | Development | TM2 | | Fixed - Not able to start water system |
|
|
|
816
|
Friday, December 05, 2014, 15:41 |
Anders Mjos | Conditioning Station | Development | TM2 | | RGA results | Measurement taken at 14:25. IG2 at ~7.7E-6
T |
|
|
815
|
Friday, December 05, 2014, 13:46 |
Anders Mjos | Conditioning Station | Development | TM2 | | Not able to start water system | TCS:WPV1 does not open when staging
is enabled. Multiple attempts have been made,
but the valve remains closed. |
|
|
814
|
Friday, December 05, 2014, 11:58 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D) water lines. | At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied |
6x |
|
813
|
Friday, December 05, 2014, 07:47 |
David Wang | Conditioning Station | Development | TM2 | | TM2 at CS | The pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec |
|
|
812
|
Thursday, December 04, 2014, 16:37 |
David Wang | Conditioning Station | Development | TM2 | | connected TM2 and CS vacuum system . | I connected TM2 and CS vacuum system. All
vacuum pumps on TM2 and CS are started .The
pumping down is good so .far |
|
|
811
|
Thursday, December 04, 2014, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target placed in F-308. | Spent targets in the mini storage were
placed into the F-308s yesterday, all F-308
have been removed from the the target hall |
|
|
810
|
Thursday, December 04, 2014, 09:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical check | Results of electrical check of TM#2 with
no source tray and no containment box attached.
See PDF for results. |
|
|
809
|
Thursday, December 04, 2014, 09:49 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the south hot
cell to the conditioning station. |
|
|
808
|
Tuesday, December 02, 2014, 13:33 |
David Wang | South Hot-Cell | Development | TM2 | | Leak check on TM2 tube heater +(D) at SHC | Chad and I leak checked TM2 tube heater+(D)
circuit at SHC with water bypass loop and
new seals installed on the water block. The |
|
|
807
|
Tuesday, December 02, 2014, 10:15 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Reburb. Loop Install | Final polish, clean with methanol and clean
compressed air.
Loop installed and torqued to 90 |
|
|
806
|
Monday, December 01, 2014, 14:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | F-308s moved | The F-308s have been moved into the target
hall, for filling on wednesday. |
|
|
805
|
Monday, December 01, 2014, 14:06 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 REFURB. WATER LOOP TEST | Some issues with the turntable and having
to wait for a decision on whether to remove
TM2 from the hot cell so that TM4 with dead |
|
|
804
|
Monday, December 01, 2014, 12:05 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance | F-308's have been serviced and are ready
to be filled with spent targets. F-308's
witch were serviced are #6,#13,#15,#16,and |
|
|
803
|
Friday, November 28, 2014, 13:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 with no target or source tray has
been moved from the north east silo to the
south hot cell. |
|
|
802
|
Wednesday, November 26, 2014, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29 | Spent targets moved to mini storage | The following targets have been moved to
the mini storage from the target storage
vault: |
|
|
801
|
Tuesday, November 25, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
|
800
|
Tuesday, November 25, 2014, 11:33 |
David Wang | South Hot-Cell | Development | | | Remove UCX 11 target transfer stand from SHC back to TH. | The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week |
|
|
799
|
Friday, November 21, 2014, 10:40 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#44 | Spent target move | The spent Ta#44 target has been removed
from the south hot cell, it was placed in
pail #121 and placed in spot 4A of the storage |
|