868
|
Tuesday, March 24, 2015, 08:46 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move |
TM#4 with no target has been moved from conditioning station to the south hot cell. |
|
867
|
Monday, March 23, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | | Ta#45 | Ta#45 inserted into hot cell |
Ta#45 has been inserted into the hot cell. Swipe taken of inner tool port area: 100000 counts/min. |
|
866
|
Monday, March 23, 2015, 07:56 |
David Wang | ITE | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Apr 15th update |
This schedule is following Dons schedule on module moves. See attachments for updating.
2015-03-27: Weekly update the schedule. The shut down job is close to the end. See attachment 3, 4. |
Attachment 1: Target_Hall_shut_down_activities.pdf
|
|
Attachment 2: Target_Hall_shut_down_activities.mpp
|
Attachment 3: Target_Hall_shut_down_activities.pdf
|
|
Attachment 4: Target_Hall_shut_down_activities.mpp
|
|
865
|
Friday, March 20, 2015, 13:37 |
chad fisher | South Hot-Cell | Development | | | TM2 Optics Tray |
Final assembly and alignment of TM2 optics tray continued today. Front section is "aligned". |
Attachment 1: 20150320_113132[2].jpg
|
|
Attachment 2: 20150320_113018_1[1].jpg
|
|
|
864
|
Tuesday, March 17, 2015, 10:33 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#11 | Spent Target Move |
The spent UC#11 has benn moved from the south hot cell to the spent target vault. See attached PDF for details. |
Attachment 1: Vault_Storage_March_17_2015.pdf
|
|
|
863
|
Monday, March 16, 2015, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move |
TM#4 from south hot cell to the conditioning station no target is attached to the module. |
|
862
|
Monday, March 16, 2015, 09:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | Module move |
TM#4 with UC#11 moved from the east target station to the south hot cell. |
|
861
|
Friday, March 13, 2015, 13:36 |
Travis Cave | Spent Target Vault | Standard Operation | | ThO#1 | Spent Target Move |
The ThO#1 has been placed in the storage vault placed in pail #122 in spot 2B of the vault. It was 6.2mSv/hr upon removal from the south hot cell. see attached PDF for details. |
Attachment 1: Storage_Vault_March_13_2015.pdf
|
|
|
860
|
Thursday, March 12, 2015, 13:33 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Target inspection |
Chad, Anders and Alex inspected the target this morning. The target had no significant visible damage to the container. Some material was deposited on the Extraction Electrode.
Phots on DocuShare |
|
859
|
Thursday, March 12, 2015, 13:04 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITE to ITW. |
5 shielding blocks have been transferred from ITE to ITW for next week TM4 move. |
|
858
|
Thursday, March 12, 2015, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move |
TM#2 with no target and no source tray has been moved from the conditioning station to the north east silo. |
|
857
|
Tuesday, March 10, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Module move |
TM#1 has been moved from the west station to the south hot cell had the ThO#1 target removed and then the modules was moved from the south hot cell to the south west silo. Also an electrical check was done on the target before it was removed. |
Attachment 1: TM1_THO_elec_chk_postbeamSHC.PDF
|
|
|
856
|
Monday, March 09, 2015, 14:01 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 removed |
ThO#1 has been removed from TM1 and placed into the plastic dissection box.
Containment box cover has been reinstalled as per usual. |
|
855
|
Monday, March 09, 2015, 09:42 |
chad fisher | South Hot-Cell | Development | | | Hot Cell Table Swiping |
3 swipes of the south hot cell table were taken from the target hall through the roof hatch (2 standard, 1 alpha).
Initial results of the table swipes are pending however swipes of the pool tool and end effector are clean, 0 counts, booties, gloves clean.
Fall arrest equipment has a puzzling 6000 counts, and suit 500 counts.
|
|
854
|
Thursday, March 05, 2015, 14:30 |
chad fisher | South Hot-Cell | Development | | | Dissection Box |
Box for dissecting targets almost complete. Should be done tomorrow. |
Attachment 1: 20150305_142144.jpg
|
|
|
853
|
Thursday, March 05, 2015, 07:17 |
David Wang | ITW | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Apr 15th update |
TH shut down jobs are processing as scheduled this week. Discussed with Don, and we think the jobs scheduled in next week should be processed as we planned. See attachments for updated schedule.
I updated the schedule today. See attachment 3, 4 for updating. 2015-Mar-10.
2013-Mar -13, I updated the schedule to show the jobs we finished this week. See attachment 5,6 |
Attachment 1: Target_Hall_shut_down_activities.pdf
|
|
Attachment 2: Target_Hall_shut_down_activities.mpp
|
Attachment 3: Target_Hall_shut_down_activities.pdf
|
|
Attachment 4: Target_Hall_shut_down_activities.mpp
|
Attachment 5: Target_Hall_shut_down_activities.pdf
|
|
Attachment 6: Target_Hall_shut_down_activities.mpp
|
|
852
|
Thursday, March 05, 2015, 06:44 |
David Wang | ITE | Maintenance | TM4 | | 5 Shielding blocks have been moved to ITE. |
5 Shielding blocks have been moved to ITE for next week TM1 move and RPG Radon test. |
|
851
|
Monday, March 02, 2015, 10:52 |
David Wang | ITE | Maintenance | TM4 | UCx | ITE primary and secondary vacuum vessels leak check. |
Dan and I leak checked ITE primary and secondary vacuum vessels with TM4 in ITE. The leak detector was hooked to ITE TP2 BV2. Leak detector base leak rate: 0.0xE-09 atm.cc/sec, base pressure: 0.0xE-4 torr. All secondary vacuum vessel seals has been checked(helium spray), and no leak has been found. On the ITE primary vacuum vessel, we leak checked every thing except the TM4 service cap and water lines inside the TM4. NO leak has been found on ITE primary vessels. The primary vacuum seals on TM4 service cap and TM4 waterlines(helium pressure test) will be checked at CS later. |
|
850
|
Friday, February 27, 2015, 09:34 |
chad fisher | South Hot-Cell | Maintenance | | | Hot cell Entry February 25 2015 |
See attached report.
Summary:
Radio problems just before entry to cell. Inspection afterwards revealed batteries charge but battery in one radio shorts out after a couple loads/cycles.
Fields in hot cell range from 630 uSv/h @ 1 m to 1.5mSv/h @ 1m. Contributing to the fields is the febiad coil line removed from TM4 in the south west corner of the hot cell.
Contamination/particulate on table as mostly black colored and of a fairly substantial size, but seamingly easy to collect. Distinquishable pieces of target material present.
Hot cell window show no sign of leaking on the inside of cell.
Pre-filter changed.
Manipulators lubricated.
Hot cell entry procedures appear to still be fairly successful in minimizing contamination migration from the hot cell.
|
Attachment 1: ISAC_South_Hot_Cell_Entry.pdf
|
|
|
849
|
Thursday, February 26, 2015, 09:22 |
David Wang | ITW | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Mar 25th |
TH shut down activities schedule from Feb 23th-March 25th. The schedule will be updated each week. See attachment 1.
Feb-27-2015: Updated the schedule, and uploaded as PDF file. See attachment 2. |
Attachment 1: Target_Hall_shut_down_activities.mpp
|
Attachment 2: Target_Hall_shut_down_activities.pdf
|
|