Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 911     Entry time: Wednesday, May 06, 2015, 14:30
Author: Travis Cave 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number: No target 
Subject: Wiring of TM#2 

Wires for TM#2 steering elements, and png gauge have been run down to the containment box level. Chad has placed them in the little cable trays. Slack has been pulled back. and termination of the wire will be done on the 7th of May. A modification was done to the signal line of the png gauge wire ultem block, as grounded screw was inserted to allow for strain relief so the end would hopefully quit breaking. See attached pictures for the details.

Attachment 1: Photo_2015-05-06_8_26_10_AM.JPG  1.287 MB  | Show | Hide all
Attachment 2: Photo_2015-05-06_8_26_17_AM.JPG  869 kB  | Show | Hide all
ELOG V2.9.2-2455