885
|
Monday, April 13, 2015, 08:59 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - June 26 2015 |
See attachments 1, 2 for target hall schedule from 07 April to 26 June 2015. The first TM1 move which is scheduled on 16 April 2015 could be delayed because of SHC operator availability. I will update the schedule once Don confirms the move date with Isaac.
Updated the schedule. The TM1 move has been re-scheduled to Friday, 17 April 2015. See attachments 3,4. |
Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdf
|
|
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mpp
|
Attachment 3: Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdf
|
|
Attachment 4: Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mpp
|
|
890
|
Monday, April 20, 2015, 07:27 |
David Wang | ITE | Standard Operation | TM4 | | Target Hall Scheduled Activities April 07 - June 26 2015 |
Weekly target hall schedule update.2015-04-20
weekly target hall schedule update 2015-04-27 attachments 3,4. |
Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mpp
|
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdf
|
|
Attachment 3: Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdf
|
|
Attachment 4: Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mpp
|
|
900
|
Monday, April 27, 2015, 17:09 |
Grant Minor | ITE | Development | TM2 | | TM2 - New Source Tray - Water Block Seal Groove Inspection Report |
The water blocks soldered to the TM2 cooling lines (see Ref. Assy. ITA6144) were inspected.
See attached inspection reports and drawings.
It was found that only 18% of the seal groove diameters and 55% of the depths were in spec.
The source tray must be tested on the test stand with c-seals to ensure that these blocks will seal properly on the module. |
Attachment 1: IMG_1859.JPG
|
|
Attachment 2: TM2_New_Source_Tray_Water_Block_Inspection_Results_24_April_2015.pdf
|
|
Attachment 3: TM2_water_block_inspect_24Apr2015.pdf
|
|
Attachment 4: TM2_New_Source_Tray_Water_Block_Inspection_Results_April_2015.xlsx
|
|
921
|
Monday, June 01, 2015, 11:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module moved |
TM#4 with Ta#45 has been moved from the east target station to the south hot cell. |
|
938
|
Wednesday, June 10, 2015, 10:02 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#31 | Module moved |
TM#4 has been moved from the conditioning station to the east target station. |
|
939
|
Wednesday, June 10, 2015, 11:49 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | TM4 has been connected in ITE |
Dan and I connected TM4 in ITE. At this stage, water is supplied to TM4 only. We checked the TM4 water signals from electrical room.They are good. The turbo-pumps will be started today once the roughing is done. |
|
940
|
Wednesday, June 10, 2015, 13:17 |
David Wang | ITE | Standard Operation | TM1 | | Target Hall Scheduled Activities April 07 - July 26 2015 |
Weekly update the schedule after some jobs have been finished in this week. |
Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.pdf
|
|
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mpp
|
|
954
|
Friday, June 19, 2015, 11:52 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | 5 Shielding blocks have been transferred from ITW to ITE. |
5 shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam. |
|
999
|
Thursday, July 16, 2015, 07:38 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 07 2015 |
Update the TH schedule according to present TM2 refurbishment process. See attachments 1,2
2015-07-20 , Update the TH schedule after some changes on TM2 and TM4 arrangement. See attachments 3,4 |
Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_07.pdf
|
|
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_07.mpp
|
Attachment 3: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
|
|
Attachment 4: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp
|
|
1006
|
Tuesday, July 21, 2015, 12:29 |
David Wang | ITE | Maintenance | | | target pit Hepa filter |
Target pit Hepa filter has been replaced today. There is 500 counts on swipe which is taken inside of the replaced filter. The field measurement on the filter wood box is less than 0.5 usv/hr on contact. Right now,The outlets of the old filter are sealed with thick plastic and duct tape. The whole filter is wrapped with plastic sheet and tape. It has been moved to SHC ante room. It will be moved out of there by Tony.N soon with RPG help. |
|
1010
|
Thursday, July 23, 2015, 10:23 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 |
Update Target Hall schedule after the changing on TM2 process. See attachment 1,2 |
Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
|
|
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp
|
|
1011
|
Friday, July 24, 2015, 10:04 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been moved from ITE to block storage area. |
Dan and I moved 5 shielding blocks from ITE to block storage area. The move is smooth. |
|
1016
|
Monday, July 27, 2015, 15:34 |
David Wang | ITE | Standard Operation | TM4 | | Leak check on TM4 HS water line with new UCX target. at SHC |
Chad and I leak checked the HS line at SHC after UCX target installation. On first round helium spray, one of VCR fitting has a leak to E-6 atm.cc/sec range. Chad tightened the fitting, and solved the problem. We leak checked both VCR fittings twice. No leak. The line will be helium pressured at CS tomorrow. |
|
1020
|
Tuesday, July 28, 2015, 10:17 |
David Wang | ITE | Repair | | | ITE TP4 has been replaced |
Tony and I replaced the ITE TP4 turbo pump today. The pumping time on controller has been reset to 0. The replaced broken pump is bagged and stored at west end of TH. |
|
1025
|
Wednesday, July 29, 2015, 08:59 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved |
TM#4 with UC#13 has been moved from the conditioning station to the east target station. |
|
1026
|
Wednesday, July 29, 2015, 10:14 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE |
Dan and I connected TM4 in ITE. We checked all water signals on ITE cooling circuits. Everything is good. |
|
1028
|
Friday, July 31, 2015, 09:47 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 |
Weekly update of Target Hall schedule after so many jobs have been finished in this week. See attachment 1, 2 |
Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
|
|
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp
|
|
1031
|
Friday, August 07, 2015, 10:01 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 19 2015 |
Weekly update target hall schedule and activities. See attachment 1,2
Update and extend Target Hall schedule to Sep 08. See attachment 3,4 |
Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
|
|
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp
|
Attachment 3: Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mpp
|
Attachment 4: Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf
|
|
|
1062
|
Wednesday, September 02, 2015, 09:26 |
David Wang | ITE | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 |
I attach new Target Hall schedules here for 2015 fall and winter runs (beam schedule 129). The TH excel sheet schedule for beam 129 is included also.
Weekly update of Target Hall Schedule.See Attachments 3,4 |
Attachment 1: Target_Hall_shedule_129_Sep_to_Dec.xlsx
|
Attachment 2: Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdf
|
|
Attachment 3: Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
|
Attachment 4: Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdf
|
|
Attachment 5: Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
|
|
1072
|
Tuesday, September 22, 2015, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved |
TM#4 with UC#13 has been moved from the east target station to the south hot cell. |