Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 847     Entry time: Monday, February 23, 2015, 12:28
Author: David Wang 
Category: ITE 
Type: Maintenance 
Module:  
Target/Number:  
Subject: 2015 shut down coils and pedal wheels replacement on ITE water flow sensors. 

Dan and I replaced pedal wheels and coils on ITE water flow sensors. It is a shut down job we did every two years. See attachment for detail.

Attachment 1: 2015_shut_down_ITE_water_sensors__replacements.pdf  171 kB  | Show | Hide all
ELOG V2.9.2-2455