647
|
Friday, April 11, 2014, 18:17 |
Keith C Ng | ITE | Repair | | | 2a3 window - install | Today:
1) Installed new cradle and shortened
beam pipe section in wall penetration. |
|
648
|
Monday, April 14, 2014, 11:57 |
Travis Cave | ITE | Standard Operation | | | entrance module move | The East Entrance module has been moved
from the south west silo to the east target
station. The move went well. |
|
649
|
Monday, April 14, 2014, 13:58 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | I reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE |
|
650
|
Tuesday, April 15, 2014, 08:53 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
conditioning station to the east target station. |
|
652
|
Wednesday, April 16, 2014, 17:08 |
Keith C Ng | ITE | Repair | | | 2a3 window - He leak check | Helium leak checked 2a3 window after installing
using remote line:
- There was a leak found between |
|
654
|
Monday, May 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
east station to the south west silo. |
|
655
|
Monday, May 05, 2014, 13:05 |
David Wang | ITE | Repair | TM3 | | ITE target module flange seal has been replaced. | ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before |
   |
656
|
Monday, May 05, 2014, 13:11 |
David Wang | ITE | Repair | TM3 | | ITE Entrance module has been disconnected. | ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures. |
    |
657
|
Tuesday, May 06, 2014, 14:05 |
Travis Cave | ITE | Standard Operation | | | module move | The entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules |
|
658
|
Wednesday, May 07, 2014, 10:08 |
David Wang | ITE | Repair | TM3 | | ITE entrance module flange seal had been replaced. | ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the |
7x |
659
|
Wednesday, May 07, 2014, 10:15 |
David Wang | ITE | Repair | TM3 | | ITE TM3, entrance module and BL2A3 window flange seals leak check.. | ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The |
|
660
|
Wednesday, May 14, 2014, 19:01 |
Grant Minor | ITE | Maintenance | TM3 | | HV short inspection at ITE | Friedhelm Ames commented to me that there
appears to be a short between High Voltage
and Ground at TM3 at ITE. |
|
661
|
Thursday, May 15, 2014, 14:38 |
David Wang | ITE | Repair | TM3 | TM3 | Bias short on ITE | Anders and I opened the HV cover in ITE
and did a visual check inside ITE HV
cover and top of TM3.Bill was with us and |
|
697
|
Wednesday, July 02, 2014, 09:02 |
Travis Cave | ITE | Standard Operation | TM3 | SiC#30 | module move | TM#3 with SiC#30 has been moved from the
conditioning station to the east target station. |
|
698
|
Wednesday, July 02, 2014, 14:29 |
David Wang | ITE | Standard Operation | | | Reconnected TM3 in ITE. | I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical |
|
699
|
Monday, July 07, 2014, 14:45 |
Grant Minor | ITE | Maintenance | TM3 | SiC #30 | FEBIAD gas line check | There were some problems this morning with
provision of FEBIAD gas to the the target
at ITE. It was suspected that the gas |
|
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
721
|
Tuesday, August 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | | | module move | ITE Entrance module has been moved back
to the east station. |
|
722
|
Tuesday, August 05, 2014, 11:53 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | ITE entrance module is reconnected in ITE. |
|
732
|
Monday, August 11, 2014, 14:30 |
David Wang | ITE | Standard Operation | TM4 | UCx #10 | TM4 is connected in ITE. | TM4 is connected in ITE. All ITE
turbo pumps are started. I will check the
pumping down process tomorrow morning. Everything |
|