Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 732     Entry time: Monday, August 11, 2014, 14:30
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx #10 
Subject: TM4 is connected in ITE. 

TM4 is connected in ITE. All ITE  turbo pumps are started. I will check the pumping down process tomorrow morning. Everything is fine so far.

ELOG V2.9.2-2455