Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 84 of 138  Not logged in ELOG logo
ID Date Author Categorydown Type Module Target/Number Subject
  756   Wednesday, September 24, 2014, 15:16 David WangITEStandard OperationTM4Ta#44Reconnected TM4 in ITE.

TM4 has been reconnected back to ITE. I started all turbo pumps on ITE and TM4. The ITE TP4s was extremely difficult to start. This pump is new, and was replaced before  the last ITE beam time on July. After several times try and starting mode switch, it is started. Its temperature and current draw showed on controller and very good after the start. The current draw on ITE TP1s is  s a little bit high and unstable. I will keep watching on ITE TP1s. I think the ITE TP1s is close to the end of the pump life. Other pumps are good so far.  

  787   Thursday, November 13, 2014, 14:05 David WangITERepairTM4 Dan and I replaced flow wheel on ITE HVC2 water flow sensor.

Dan and I replaced flow wheel on ITE HVC2 water flow sensor. The old wheel did rotate smoothly inside its SST case. The new wheel works fine.

  792   Tuesday, November 18, 2014, 11:15 David WangITEStandard OperationTM4Ta#44TM4 has been disconnected in ITE.

Dan and I disconnected TM4 in ITE.

  796   Thursday, November 20, 2014, 11:49 Travis CaveITEStandard OperationTM4UC#11module move

TM#4 with UCx#11has been moved from the conditioning station to the east target station.

  797   Thursday, November 20, 2014, 14:12 David WangITEStandard OperationTM4UCx11TM4 is connected in ITE.

TM4 has been connected connect in ITE. Water is supplied to TM4 module only.

  801   Tuesday, November 25, 2014, 12:45 David WangITEStandard OperationTM4UCx115 Shielding blocks have been transferred from ITW to ITE.

5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam.

  827   Tuesday, January 06, 2015, 11:14 David WangITEStandard OperationTM4 4 Shielding blocks have been moved out of ITE .

4 shielding blocks have been moved out of  ITE to block storage area. Fiona did the survey and with me during the move.

  830   Thursday, January 08, 2015, 08:04 David WangITEStandard OperationTM4 TM4 water lines have been disconnected in ITE and purged.

TM4 waterlines have been disconnected and purged in ITE. The TM4 vacuum system is still in operation.

  845   Tuesday, February 17, 2015, 13:06 Anders MjosITEDevelopment  Resistance measured of TGHT and TBHT lines to ITE

The copper bars was installed by David and Anders. After the measurements were completed, the copper bars were removed.

See photo and attached spread sheet.

Attachment 1: 002.JPG
002.JPG
Attachment 2: Resistance_from_Electrical_Room_to_Target_Station.xlsx
  847   Monday, February 23, 2015, 12:28 David WangITEMaintenance  2015 shut down coils and pedal wheels replacement on ITE water flow sensors.

Dan and I replaced pedal wheels and coils on ITE water flow sensors. It is a shut down job we did every two years. See attachment for detail.

Attachment 1: 2015_shut_down_ITE_water_sensors__replacements.pdf
2015_shut_down_ITE_water_sensors__replacements.pdf
  851   Monday, March 02, 2015, 10:52 David WangITEMaintenanceTM4UCxITE primary and secondary vacuum vessels leak check.

Dan and I leak checked ITE primary and secondary vacuum vessels with TM4  in ITE. The leak detector was hooked to ITE TP2 BV2. Leak detector  base leak rate: 0.0xE-09 atm.cc/sec, base pressure: 0.0xE-4 torr. All secondary vacuum vessel seals has been checked(helium spray), and no leak has been found. On the ITE primary vacuum vessel, we  leak checked every thing except the TM4 service cap and water lines inside the TM4. NO leak has been found on ITE primary vessels. The primary vacuum seals on TM4 service cap and TM4 waterlines(helium pressure test) will be checked at CS later.

  852   Thursday, March 05, 2015, 06:44 David WangITEMaintenanceTM4 5 Shielding blocks have been moved to ITE.

5 Shielding blocks have been moved to ITE for next week TM1 move and RPG Radon test.

  859   Thursday, March 12, 2015, 13:04 David WangITEStandard OperationTM4 5 Shielding blocks have been transferred from ITE to ITW.

5 shielding blocks have been transferred from ITE to ITW for next week TM4 move.

  862   Monday, March 16, 2015, 09:41 Travis CaveITEStandard OperationTM4UC#11Module move

TM#4 with UC#11 moved from the east target station to the south hot cell.

  866   Monday, March 23, 2015, 07:56 David WangITEStandard Operation  TH Shut Down Activities Schedule Feb 23th- Apr 15th update

This schedule is following Dons schedule on module moves. See attachments for updating.

2015-03-27: Weekly update the schedule. The shut down job is close to the end. See attachment 3, 4.

Attachment 1: Target_Hall_shut_down_activities.pdf
Target_Hall_shut_down_activities.pdf Target_Hall_shut_down_activities.pdf
Attachment 2: Target_Hall_shut_down_activities.mpp
Attachment 3: Target_Hall_shut_down_activities.pdf
Target_Hall_shut_down_activities.pdf Target_Hall_shut_down_activities.pdf
Attachment 4: Target_Hall_shut_down_activities.mpp
  877   Monday, March 30, 2015, 07:38 David WangITEStandard OperationTM4 TH Shut Down Activities Schedule Feb 23th- Apr 15th update

Updated schedule this morning after last Fridays ISAC facility support group meeting.

Updated schedule on 2015-April -02. See attachments 3,4. The scheduled all shut down jobs are done on time.The TM2 move to SHC will be delayed to May.There will be a new beam running time TH activities schedule (start from April 15) replacing this shut down schedule on next time  weekly update.

Attachment 1: Target_Hall_shut_down_activities.pdf
Target_Hall_shut_down_activities.pdf Target_Hall_shut_down_activities.pdf
Attachment 2: Target_Hall_shut_down_activities.mpp
Attachment 3: Target_Hall_shut_down_activities.pdf
Target_Hall_shut_down_activities.pdf Target_Hall_shut_down_activities.pdf
Attachment 4: Target_Hall_shut_down_activities.mpp
  881   Wednesday, April 01, 2015, 10:52 Travis CaveITEStandard OperationTM4Ta#45Module move

TM#4 with Ta#45 has been moved from the conditioning station to the east target station.

  882   Wednesday, April 01, 2015, 13:08 David WangITEStandard OperationTM4 Replaced ITE tank to module 42X0.275 o-ring

I replaced ITE tank to module 42 ID X 0.275 o-ring. The o-ring is changed once a year before the first beam time. The flanges was cleaned and the new o-ring was installed. It works fine.

Attachment 1: 001.JPG
001.JPG
Attachment 2: 002.JPG
002.JPG
Attachment 3: 004.JPG
004.JPG
Attachment 4: 005.JPG
005.JPG
Attachment 5: 006.JPG
006.JPG
  883   Wednesday, April 01, 2015, 13:12 David WangITEStandard OperationTM4Ta#45TM4 has been connected in ITE

TM4 has been connected in ITE. ITE six turbo-pumps have been started. So far so good.

  884   Friday, April 10, 2015, 15:40 David WangITEStandard OperationTM4 5 Shielding blocks have been transferred from ITW to ITE.

5 shielding  blocks have been transferred to ITE. The ITE is configured to take proton beam.

ELOG V2.9.2-2455