Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 83 of 138  Not logged in ELOG logo
ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  652   Wednesday, April 16, 2014, 17:08 Keith C NgITERepair  2a3 window - He leak checkHelium leak checked 2a3 window after installing
using remote line: 
- There was a leak found between
  
  654   Monday, May 05, 2014, 10:40 Travis CaveITEStandard OperationTM3TiC#4module moveTM#3 with TiC#4 has been moved from the
east station to the south west silo.
  
  655   Monday, May 05, 2014, 13:05 David WangITERepairTM3 ITE target module flange seal has been replaced.ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before
 004.JPG008.JPG008.JPG007.JPG 
  656   Monday, May 05, 2014, 13:11 David WangITERepairTM3  ITE Entrance module has been disconnected.ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures.
 011.JPG025.JPG033.JPG035.JPG032.JPG 
  657   Tuesday, May 06, 2014, 14:05 Travis CaveITEStandard Operation  module moveThe entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules
  
  658   Wednesday, May 07, 2014, 10:08 David WangITERepairTM3 ITE entrance module flange seal had been replaced.ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the
 7x 
  659   Wednesday, May 07, 2014, 10:15 David WangITERepairTM3 ITE TM3, entrance module and BL2A3 window flange seals leak check..ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The
  
  660   Wednesday, May 14, 2014, 19:01 Grant MinorITEMaintenanceTM3 HV short inspection at ITEFriedhelm Ames commented to me that there
appears to be a short between High Voltage
and Ground at TM3 at ITE.
  
  661   Thursday, May 15, 2014, 14:38 David WangITERepairTM3TM3Bias short on ITEAnders and I opened the HV cover in ITE
and did  a visual check inside ITE HV 
cover and top of TM3.Bill was with us and
  
  697   Wednesday, July 02, 2014, 09:02 Travis CaveITEStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
conditioning station to the east target station.
  
  698   Wednesday, July 02, 2014, 14:29 David WangITEStandard Operation  Reconnected TM3 in ITE.I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical
  
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 
  700   Tuesday, July 08, 2014, 09:57 David WangITEStandard OperationTM3 5 Shielding blocks have been transferred from ITW to ITE.5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  721   Tuesday, August 05, 2014, 10:40 Travis CaveITEStandard Operation  module moveITE Entrance module has been moved back
to the east station.
  
  722   Tuesday, August 05, 2014, 11:53 David WangITERepair  Reconnected ITE entrance moduleITE entrance module is reconnected in ITE.   
  732   Monday, August 11, 2014, 14:30 David WangITEStandard OperationTM4UCx #10TM4 is connected in ITE.TM4 is connected in ITE. All ITE 
turbo pumps are started. I will check the
pumping down process tomorrow morning. Everything
  
  733   Wednesday, August 13, 2014, 12:21 David WangITERepairTM4UCx10ITE TP4S is replacedITE TP4S was broken down last night . I
stopped the ITE pumps and vented station
with Argon this morning. Edi and I replaced
  
  734   Wednesday, August 20, 2014, 10:25 David WangITEStandard OperationTM4 5 Shielding blocks have been transferred from ITW to ITE.5 Shielding blocks have been transferred
from ITW to ITE. ITE  is configured
to take proton beam.
  
  751   Tuesday, September 23, 2014, 11:49 David WangITEStandard OperationTM4UCx #10TM4 has been disconnected in ITE.TM4 has been disconnected and moved to
SHC from ITE. ITE was vented with argon before
move.
  
  754   Wednesday, September 24, 2014, 10:41 Travis CaveITEStandard OperationTM4Ta#44module moveTM#4 with Ta#44 has been moved from the
south hot cell to the east target station.
  
ELOG V2.9.2-2455