  581   Monday, January 20, 2014, 13:35 David WangITEStandard OperationTM4 5 shielding blocks had been moved out of ITE5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF
ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND
ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR
  
  582   Monday, January 20, 2014, 13:38 David WangITEStandard OperationTM4 DISCONNECTED TM4 IN ITE.I DISCONNECTED TM4 IN ITE. ALL WATER LINES
HAD BEEN PURGED OUT WITH PRESSURE AIR.
  
  584   Monday, January 20, 2014, 14:37 Travis CaveITEStandard OperationTM4UC#8module moveTM#4 with UC#8 has been moved from the
east target station to the south hot cell.
  
  586   Wednesday, January 22, 2014, 10:51 David WangITERepair  Removed 4 shielding blocks located on top of preseperator in THTravis and I removed 4 shielding blocks
located on top of pre-seperator  in
TH. This is a job for ITE harp 9 re-installation
  
  610   Tuesday, March 04, 2014, 10:19 Travis CaveITEStandard OperationTM3no targetmodule moveTM#3 has been moved from the silo to the
east target station.
  
  613   Thursday, March 06, 2014, 06:58 David WangITEMaintenanceTM3 ITE vacuum and leak check on ITE BL2A window flange.ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low
  
  616   Friday, March 07, 2014, 12:45 David WangITEStandard OperationTM3 TM3 and ITE air to vacuum leak check and TM3 water lines helium test.With TM3 located in ITE, All air to vacuum
seals  on ITE primary and secondary
vacuum vessel have been leak  checked
 001.JPG002.JPG003.JPG010.JPG013.JPG 
  617   Monday, March 10, 2014, 09:39 Travis CaveITEStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the east target station to the south west
silo.
  
  618   Tuesday, March 11, 2014, 10:47 Travis CaveITERepair  entrance module moveITE entrance module has been moved from
the east station to the south east silo.
  
  620   Wednesday, March 12, 2014, 16:33 Keith C NgITERepair  2A3 window removal and replacementprep'ed area for work:
- removed shield plug from window
clamp area
 20140312_2a3window_RHB_6676.JPG20140312_2a3window_RHB_6682.JPG2a_bp_sw1_white_powder_under_w11.PDF2a_bp_sw2_white_powder_under_w11.PDF2a_bp_sw3_rust_w11.PDF 
  622   Thursday, March 13, 2014, 16:23 Keith C NgITERepair  2a3 window - inspectionVideo inspected 2a3 window joint this morning.
Screenshots from video showing debris
forming around aluminum cradle and brown/red
 Fullscreen_capture_03132014_41458_PM.bmp.jpgFullscreen_capture_03132014_41527_PM.bmp.jpg 
  623   Monday, March 17, 2014, 15:39 Keith C NgITERepair  2a3 window - prep and cleanCleaned top of the ITE vacuum flange and
top of window clamp. Attempted to clean the
bellows/beam pipe through the wall, mostly
  
  624   Tuesday, March 18, 2014, 16:01 Keith C NgITERepair  2a3 window - prep and cleanContinued with vacuuming inside wall penetration
to remove debris. Changed filter bag in nilfisk
vacuum, left old filter in place however
 Fullscreen_capture_03182014_35409_PM.bmp.jpgFullscreen_capture_03182014_35316_PM.bmp.jpg 
  626   Wednesday, March 19, 2014, 16:48 Keith C NgITERepair  2a3 window - beam tube removalToday:
1) Vaccumed top and around clamp.
Disconnected clamp from flanges and removed
 11x 
  628   Friday, March 21, 2014, 16:49 Keith C NgITERepair  2a3 window - tank flange inspectionToday:
1) Cleaned flange with methanol and
cotton glove, appears to be clean.
 20140321_2a3window_RHB_6777.JPG20140321_2a3window_P1030055.JPG20140321_2a3window_P1030057.JPG20140321_2a3window_IMG_0846.JPG 
  638   Friday, April 04, 2014, 14:59 Keith C NgITEMaintenance  measurement of new beam tube sectionR. Kuramoto and A. Laxdal measured the
distance from the 2A tunnel to the tank flange
of ITE. The new fabricated beam pipe with
 wall_to_flange_length.pdf 
  647   Friday, April 11, 2014, 18:17 Keith C NgITERepair  2a3 window - installToday:
1) Installed new cradle and shortened
beam pipe section in wall penetration.
  
  648   Monday, April 14, 2014, 11:57 Travis CaveITEStandard Operation  entrance module moveThe East Entrance module has been moved
from the south west silo to the east target
station. The move went well.
  
  649   Monday, April 14, 2014, 13:58 David WangITERepair  Reconnected ITE entrance moduleI reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE
  
  650   Tuesday, April 15, 2014, 08:53 Travis CaveITEStandard OperationTM3TiC#4module moveTM#3 with TiC#4 has been moved from the
conditioning station to the east target station.
  