  2618   Tuesday, June 18, 2024, 15:16 Adam NewsomeCraneMaintenance  Pail Handling Tool - Annual InspectionThe pail handling tool which is used to
move 5 gallon pails around  the target hall
was inspected by A. Newsome.  The main tool
 PXL_20240618_213742257.jpgPXL_20240618_213455575.jpgPXL_20240618_213626154.jpg 
  517   Tuesday, October 22, 2013, 14:23 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementsas measured today in the electrical room
by David and Anders
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow.pdf 
  529   Friday, October 25, 2013, 13:39 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementswith TM4 in ITW as measured today in the
electrical room by David and Anders.
 
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_wITW-TM4.pdf 
  532   Thursday, October 31, 2013, 11:38 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementswith TM4 in ITW as measured today in the
electrical room by David and Anders.
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_EOB.pdf 
  508   Friday, October 18, 2013, 10:17 Bevan MossITWRepair  Paddle Wheel Yesterday I visually inspected the
paddle wheel and noticed that it was spinning
freely and constant. As the signal was intermittent
  
  2379   Wednesday, October 19, 2022, 12:00 Carla BabcockNorth Hot-CellStandard OperationTM4SiC#44PIE on SiC#44Conducted PIE on SiC#44, which failed online.
It had a cathode short, a target short and
an anode short by the time we called the
 SiC44_PIE_20221012_150145.jpgSiC44_PIE_20221012.jpgSiC44_PIE_20221012_161755.jpg 
  1335   Wednesday, August 24, 2016, 14:37 Anders MjosSouth Hot-CellStandard Operation SiC#33PIE The target was inspected by Anders
and Chad. The target was in good condition
as can be seen on the photos on DocuShare.
  
  2087   Tuesday, March 17, 2020, 12:58 David WangSouth Hot-CellDevelopmentTM4 P2N target electrical check and leak check at SHC.See attachment. Everything looks good.
 P2N_target_electrical_chek_at_SHC.pdf 
  2223   Thursday, June 03, 2021, 08:33 David WangSouth Hot-CellStandard OperationTM4UCX32# P2NP2N UCX 32 on TM4 electical check and leak check at SHC.Both electrical check and leak check (HS
and Window lines)results are good.  
See attachments
 P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf 
  2673   Thursday, September 05, 2024, 12:50 Adam NewsomeCraneMaintenance  Overhead crane: up/down hoist delayed start issueD. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode.
  
  1871   Tuesday, February 19, 2019, 11:56 chad fisherSouth Hot-CellRepairTM2 Optics tray removalAaron has removed the optics tray in TM2
in preparation for source tray removal.
  
  1720   Wednesday, May 23, 2018, 10:40 chad fisherSouth Hot-CellRepairTM4 Optics Tray RemovalThe optics tray has been removed from TM4.
 
 
 20180523_103405.jpg20180523_103435.jpg20180523_103440.jpg 
  2185   Wednesday, February 10, 2021, 11:34 David WangAssembly/Bench TestStandard Operation  Old resin can and 2A window RH clamp field measurement at silo. Old resin can:  0.5 meter 360 degree
rotation above silo area, 350u sv/hr.  
On contact  3.0 to 3.5 msv/hr. 
  
  1677   Tuesday, January 16, 2018, 10:36 Anders MjosSpent Target VaultStandard OperationTM2 Old TM2 Source Tray moved to Cyclotron basementThe old TM2 Source Tray from 2009 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 9. The
  
  1679   Wednesday, January 17, 2018, 10:38 Anders MjosSpent Target VaultStandard OperationTM1 Old TM1 Source Tray moved to Cyclotron basementThe old TM1 Source Tray from 2011 has been
moved to Cyclotron basement  this morning.
Source tray was stored in location 10. The
  
  1937   Monday, June 10, 2019, 14:13 Travis CaveSpent Target VaultStandard Operation  Old TM#4 source tray moved The old TM#4 source tray in the south
hot cell was moved to the spent target vault.
The tray had a low of 7.5mSv/hr to a high
  
  1692   Wednesday, March 07, 2018, 10:18 David WangITWStandard Operation  Oil leak on target station vacuum primary back pump.I can not see oil in sight window of the
primary pump during visual inspection. The
aluminum tray underneath the pump is filled
  
  690   Wednesday, June 25, 2014, 12:55 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Object - possibly cable tie found in Containment Box See attached PDF. The object is not
accessible with only the front panel removed.
Photos on DocuShare.
 TiC#4_Cable_Tie.pdf 
  346   Wednesday, May 15, 2013, 10:25 Bevan MossConditioning StationRepair  ONICON flow meter Scott Adair from Riada sales came
to site to complete diagnostics on the ONICON
flow meter. He could not determine the problem
  
  1118   Friday, November 06, 2015, 14:44 Anders MjosConditioning StationRepairTM3 O-rings replaced on service capO-rings were replaced on the service cap
by Anders, Maico, Aurelia and Keith under
work permit  I2015-11-05-5
  