Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1906     Entry time: Friday, April 12, 2019, 11:44
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Pail transfer 

Pail transfer was undertaken in the south hot cell. went very well except near the end the master tong cable of the right hand manipulator broke. Not entirely a surprise due to the amount of use it has seen lately.

ELOG V2.9.2-2455