  RH-ISAC, Page 81 of 140  Not logged in ELOG logo
Entry  Tuesday, June 18, 2024, 15:16, Adam Newsome, Crane, Maintenance, , , Pail Handling Tool - Annual Inspection PXL_20240618_213742257.jpgPXL_20240618_213455575.jpgPXL_20240618_213626154.jpg
The pail handling tool which is used to move 5 gallon pails around  the target hall was inspected by A. Newsome.  The main tool was checked, but not
the spare as it is currently in a disassembled and unusable state. The tool appears to be in good, working condition. The following items were checked.

    Inspect structural integrity of long tube - check for bending, warpage, dents, cracks, rust/corrosion
    Inspect structural
Entry  Tuesday, October 22, 2013, 14:23, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow.pdf
as measured today in the electrical room by David and Anders
Entry  Friday, October 25, 2013, 13:39, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_wITW-TM4.pdf
with TM4 in ITW as measured today in the electrical room by David and Anders.
 
Entry  Thursday, October 31, 2013, 11:38, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_EOB.pdf
with TM4 in ITW as measured today in the electrical room by David and Anders.
Entry  Friday, October 18, 2013, 10:17, Bevan Moss, ITW, Repair, , , Paddle Wheel 
 Yesterday I visually inspected the paddle wheel and noticed that it was spinning freely and constant. As the signal was intermittent replaced the
coil at the back of the wheel only. This does not require access to the high active water. With the coil replaced the signal looked strong. I asked operations
to keep and eye on it and advise if the problem has been resolved. I also discussed with David this morning and he informed me that this is the same procedure
Entry  Wednesday, October 19, 2022, 12:00, Carla Babcock, North Hot-Cell, Standard Operation, TM4, SiC#44, PIE on SiC#44 SiC44_PIE_20221012_150145.jpgSiC44_PIE_20221012.jpgSiC44_PIE_20221012_161755.jpg
Conducted PIE on SiC#44, which failed online. It had a cathode short, a target short and an anode short by the time we called the experiment off. In
the post irradiation examination, two clear marks where the target legs touched the heat shield were found (see attachments 1 and 2). No marks were found
to indicate where the cathode short would have been. The fibreglass sheath covering the anode wire where it passes over top of the coil was destroyed,
Entry  Wednesday, August 24, 2016, 14:37, Anders Mjos, South Hot-Cell, Standard Operation, , SiC#33, PIE 
 The target was inspected by Anders and Chad. The target was in good condition as can be seen on the photos on DocuShare.
Only minor accumulation of material on the EE.
Entry  Tuesday, March 17, 2020, 12:58, David Wang, South Hot-Cell, Development, TM4, , P2N target electrical check and leak check at SHC. P2N_target_electrical_chek_at_SHC.pdf
See attachment. Everything looks good. 
Entry  Thursday, June 03, 2021, 08:33, David Wang, South Hot-Cell, Standard Operation, TM4, UCX32# P2N, P2N UCX 32 on TM4 electical check and leak check at SHC. P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf
Both electrical check and leak check (HS and Window lines)results are good.   See attachments
Correction: It should be UCx#32 P2N instead of UCx33# in check list attached . UCx#33 is on TM2 in ITW
Entry  Thursday, September 05, 2024, 12:50, Adam Newsome, Crane, Maintenance, , , Overhead crane: up/down hoist delayed start issue 
D. Wang reports that recently the overhead crane has been exhibiting a delayed start (approx. 1 min) when operating in local mode. This issue applies
to the main hoist's up/down functionality only and does not seem to apply to other motion axes. T. Kauss briefly investigated but did not find any obvious
cause.
Entry  Tuesday, February 19, 2019, 11:56, chad fisher, South Hot-Cell, Repair, TM2, , Optics tray removal 
Aaron has removed the optics tray in TM2 in preparation for source tray removal.
Entry  Wednesday, May 23, 2018, 10:40, chad fisher, South Hot-Cell, Repair, TM4, , Optics Tray Removal 20180523_103405.jpg20180523_103435.jpg20180523_103440.jpg
The optics tray has been removed from TM4.
 
 
Entry  Wednesday, February 10, 2021, 11:34, David Wang, Assembly/Bench Test, Standard Operation, , , Old resin can and 2A window RH clamp field measurement at silo.  
Old resin can:  0.5 meter 360 degree rotation above silo area, 350u sv/hr.   On contact  3.0 to 3.5 msv/hr.  It was replaced
during 2017 winter shut down, and stored in silo since then. 
2a window RH clamp: 0.5 meter, 160 usv/hr.  On contact, hottest spot 3.5msv/hr, general,1.8 msv/hr.  
Entry  Tuesday, January 16, 2018, 10:36, Anders Mjos, Spent Target Vault, Standard Operation, TM2, , Old TM2 Source Tray moved to Cyclotron basement 
The old TM2 Source Tray from 2009 has been moved to Cyclotron basement this morning. Source tray was stored in location 9. The box was moved from the
vault to the ante-room yesterday. No contamination was found on the box.
Entry  Wednesday, January 17, 2018, 10:38, Anders Mjos, Spent Target Vault, Standard Operation, TM1, , Old TM1 Source Tray moved to Cyclotron basement 
The old TM1 Source Tray from 2011 has been moved to Cyclotron basement  this morning. Source tray was stored in location 10. The box was moved  from
the vault to the ante-room yesterday. No contamination was found on  the box. Photos
Entry  Monday, June 10, 2019, 14:13, Travis Cave, Spent Target Vault, Standard Operation, , , Old TM#4 source tray moved 
 The old TM#4 source tray in the south hot cell was moved to the spent target vault. The tray had a low of 7.5mSv/hr to a high of 22.1mSv/hr though
a 390 degree rotation.
Entry  Wednesday, March 07, 2018, 10:18, David Wang, ITW, Standard Operation, , , Oil leak on target station vacuum primary back pump. 
I can not see oil in sight window of the primary pump during visual inspection. The aluminum tray underneath the pump is filled with oil. The performance
on this pump start to drop by watching ITH CG4 reading. A fault report with suggestion is issued to vacuum group.  Everything on secondary pump looks
fine.
Entry  Wednesday, June 25, 2014, 12:55, Anders Mjos, South Hot-Cell, Standard Operation, TM3, TiC#4, Object - possibly cable tie found in Containment Box TiC#4_Cable_Tie.pdf
 See attached PDF. The object is not accessible with only the front panel removed. Photos on DocuShare.
Entry  Wednesday, May 15, 2013, 10:25, Bevan Moss, Conditioning Station, Repair, , , ONICON flow meter 
 Scott Adair from Riada sales came to site to complete diagnostics on the ONICON flow meter. He could not determine the problem and believes that
there was a short in the head. He has taken the flow meter for what should be warranty repair. The flow meter is for diagnostics only, the conditioning
station can still operate without it.
Entry  Friday, November 06, 2015, 14:44, Anders Mjos, Conditioning Station, Repair, TM3, , O-rings replaced on service cap 
O-rings were replaced on the service cap by Anders, Maico, Aurelia and Keith under work permit  I2015-11-05-5
   

 