  192   Tuesday, October 09, 2012, 10:35 David WangITEStandard OperationTM4NiO #1Disconnected TM4 in ITE.I disconnected TM4 in ITE this morning.
The heat shield circuit has been purged with
air.
  
  193   Tuesday, October 09, 2012, 11:17 Bevan MossITEStandard OperationTM4NiO#1Module Move TM4 with NiO#1 was moved from ITE
to the SHC today. The move went well with
no issues.
  
  197   Wednesday, October 24, 2012, 11:51 Travis CaveITEStandard OperationTM4UCx#5module movedYesterday TM#4 with UCx#5 was moved to
the east target station from the conditioning
station,  move went well.
  
  199   Wednesday, October 31, 2012, 11:24 David WangITEStandard OperationTM4 Transfer five shielding blocks from ITW to ITE.Bevan and I transferred five shielding
blocks from ITW to ITE. ITE is ready for
taking proton beam.
  
  215   Wednesday, November 14, 2012, 11:04 David WangITERepairTM4 Change ITE dump water circiut flow wheelI changed ITE dump water circuit flow wheel
due to its poor performance. The new flow
wheel works fine. The signal on electrical
  
  218   Monday, December 03, 2012, 19:34 Grant MinorITEStandard OperationTM4LpUCxArgon supply opened for ITE ventAround 7pm tonight I opened the main valve
approximately 1.5 turns on  the Argon bottle
used for venting ITE, located in the ISAC
 Argon_Vent_ITE_Cylinder_Pressure_3Dec2012.jpgArgon_Vent_ITE_Secondary_Regulator_Pressure_Relief_3Dec2012.jpgArgon_Vent_ITE_Needle_Valve_3Dec2012.jpg 
  219   Tuesday, December 04, 2012, 13:27 Travis CaveITEStandard OperationTM4UCx#5module move & electrical checkTM#4 with UC#5 has been moved from east
target station to the south hot cell move
went well.  Also the electrical check
 UC#5_SIS_Post_beam.PDF 
  220   Tuesday, December 04, 2012, 13:33 David WangITEStandard OperationTM4UCX#5Disconnected TM4 in ITE.I disconnected TM4 in ITE. All water lines
had been purged.Travis was with me .
  
  243   Friday, February 08, 2013, 11:42 Grant MinorITEMaintenance  TAPC 477 resolved - ISAC elec. room gas cylinderSee attached TAPC 477 documentation.  TAPC-477_resolved_8Feb2013.pdf 
  251   Friday, March 01, 2013, 11:35 David WangITEMaintenanceTM4 Leak check on ITE and TM4. The
leak  check on TM4 and ITE is done. All primary
vacuum vessel , secondary vacuum  vessel 
  
  255   Friday, March 08, 2013, 15:50 Bevan MossITEStandard OperationTM4CS Test Target #1Module Move from ITE to SHC Today David and I moved the module
from ITE to the SHC. Move went very smoothly,
David operated the cameras and has had basic
  
  279   Wednesday, March 27, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well.
  
  280   Wednesday, March 27, 2013, 11:49 David WangITEStandard OperationTM4Sic LIS-RFQ Connected TM4 in ITETM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after 
  
  284   Wednesday, April 03, 2013, 12:26 David WangITEMaintenanceTM4Sic LIS/RFQLeak check on ITE TM4.TM 4 had been leak check in ITE due to
  relatively high PNG1 and IG1 readings.All
TM4 primary and secondary  vessel air
  
  302   Wednesday, April 17, 2013, 10:35 David WangITEStandard OperationTM4 I moved 5 shielding blocks back to ITE.5 shielding block had been moved 
back to ITE. The ITE is configured to take
proton beam.
  
  343   Wednesday, May 15, 2013, 10:00 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th.
  
  353   Tuesday, May 21, 2013, 11:38 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#3 with SiC#28 (RFQ Target) has been
moved from the east target station to the
south west silo.
  
  369   Tuesday, May 28, 2013, 10:37 Travis CaveITEStandard OperationTM4Ta#40module moveTM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well.
  
  371   Wednesday, May 29, 2013, 06:32 David WangITEStandard OperationTM4Ta#40TM4 has been connected in ITE.TM4 has been connected in ITE. The pumping
down is fine so far.TM4 water interlock check
was done yesterday.
  
  374   Tuesday, June 04, 2013, 12:36 David WangITEStandard OperationTM4 5 shielding blocks are transferred from ITW to ITEDan an I  transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam.
  