  441   Wednesday, September 04, 2013, 12:21 Bevan MossSouth Hot-CellRepairTM3 Ante-room work September 3rd
David Wang and myself lowered the
leak testing cart into the Ante room and
 IMG_0983.JPG 
  442   Wednesday, September 04, 2013, 18:53 Grant MinorSouth Hot-CellRepairTM3 Maico's measurements of new c-seals and bench-tested c-sealsToday Maico measured the thickness of three
indium-plated inconel c-seals, presumably
Ultra-Seal P/N 50606.  These seals had
 c-seals_GStanford_file_chronological_4Sept2013.pdfGuyStanford_cseal_file_scanned_30Aug2013.pdf 
  443   Wednesday, September 04, 2013, 19:01 Grant MinorSouth Hot-CellRepairTM3 Inspection / Ante Room Leak Check Results on TM3 Heat Shield lines (3 Sept 2013)Yesterday, Grant entered the Ante Room
with David Wang to visually inspect the two
sets of failed c-seals from the Heat Shield
 TM3_Heat_Shield_Water_Block_-_c-seal_vs_delta_seal_DRAFT_3Sept2013.pdf 
  444   Friday, September 06, 2013, 16:41 Bevan MossSouth Hot-CellDevelopmentTM3 C-Seal crush investigation  Today Maico completed the new leak
testing tool and blank off. He tested  them
with C-seals without springs and all was
 6x 
  445   Friday, September 06, 2013, 17:50 Grant MinorSouth Hot-CellDevelopmentTM3 C-Seal crush investigation

    

       
            
  
  446   Tuesday, September 10, 2013, 12:11 Isaac EarleSouth Hot-CellRepairTM3 Module side heat shield water block polishing and blank-off installation The sealing surfaces of the module
side heat shield water block were polished
on September 9th in the morning using Chad's
  
  449   Wednesday, September 11, 2013, 13:43 David WangConditioning StationDevelopmentTM3 Started 3 turbo pumps on CS for TM3TM3 has been connected in CS.Three turbo-
pumps have been started. The pumping down
is fine so far.
  
  450   Wednesday, September 11, 2013, 15:37 Bevan MossSouth Hot-CellRepairTM3 C-Seal leak checking and repair This e-log is to cover the work completed
from September 9th until the 11th. 
September 9th
  
  453   Friday, September 13, 2013, 07:49 David WangConditioning StationDevelopmentTM3 TM3 water lines leak check at CSI leak checked TM3 water lines at CS with
60 psi and 80psi helium. The base leak rate
is 5.0xe-9 atm.cc/sec. Each circuit 3 minutes
 TM3_water_lines_leak_check_at_CS.pdf 
  454   Friday, September 13, 2013, 08:05 David WangSouth Hot-CellRepairTM4 TM4 coil 1 leak check in SHCLeak checked TM4 coil1 in SHC with Isaac
. The leak detector only can pump down to
1.5xE-7 atm.cc/sec. The leak detector got
 TM4_coil_1_leak_check.pdf 
  455   Tuesday, September 17, 2013, 14:36 Bevan MossSouth Hot-CellStandard OperationTM3 Containment Box has been removed The containment box has been removed.
Tomorrow the wiring harness will be installed.
  
  458   Thursday, September 19, 2013, 15:56 Bevan MossSouth Hot-CellRepairTM3 Activities for September 18th and 19thSeptember 18th
The wiring harness was completed
by Maico and Travis today (see pics) and
 IMG_1127.JPGIMG_1134.JPGIMG_1137.JPGIMG_1139.JPGIMG_1143.JPG 
  459   Monday, September 23, 2013, 13:55 David WangSouth Hot-CellStandard OperationTM3 window circuit leak checkThis morning, Bevan and I leak checked
window circuit on TM3 at SHC after containment
box was installed. It took about 20minutes
  
  460   Monday, September 23, 2013, 16:10 Bevan MossSouth Hot-CellRepairTM3 Activities Sept 20 - 23 2013 September 20th
Today was a trying day. When attempting
to make the water line  connections for the
  
  462   Tuesday, September 24, 2013, 14:46 Bevan MossSouth Hot-CellRepair  Right manipulator repair    
  463   Wednesday, September 25, 2013, 06:59 maicodallavalleSouth Hot-CellStandard OperationTM3 Containment box coverThe containment box cover has had all 
the bolts installed and all bolts were checked
with a mirror. TM3 has been raised and is
  
  467   Thursday, September 26, 2013, 09:46 maicodallavalleConditioning StationRepairTM3 Leak check / Pressure TestTM3 has had all of the water lines pressurized
with Helium and the Helium Leak detector
was connected to the turbo pumps. There were
  
  486   Wednesday, October 02, 2013, 13:44 Bevan MossSouth Hot-CellStandard OperationTM4 Right Coil is leaking Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the
 tm4leak.jpg 
  500   Tuesday, October 08, 2013, 18:12 Grant MinorCraneRepairTM4 Target Hall Crane Stuck in East-West Direction - UpdateGrant Minor wrote this e-mail today:
***
Hello all,
 THall_Crane_Bridge_Wheel_at_South_Rail_Splice_8Oct2013.JPGNORELCO_inv13045_joMS-064_31March2013.pdf 
  501   Wednesday, October 09, 2013, 19:33 Grant MinorCraneRepairTM4 Target Hall Crane not operational - likely controls / PLC hardware failure (not stuck wheel)

    

       
            
  