  RH-ISAC  Not logged in ELOG logo
Message ID: 443     Entry time: Wednesday, September 04, 2013, 19:01
Author: Grant Minor 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: Inspection / Ante Room Leak Check Results on TM3 Heat Shield lines (3 Sept 2013) 

Yesterday, Grant entered the Ante Room with David Wang to visually inspect the two sets of failed c-seals from the Heat Shield circuit, to remove the second set from the Heat Shield water blocks, and to leak check the heat shield circuit with o-rings and a water-block-to-leak-detector fitting.

Some photos of the inspected seals are in the attached design review presentation.  Some unusual marks were observed on both sets of failed seals.

The heat shield lines and water block assembly leak checked successfully to the bottom of the leak rate range ("UNDER" ~1x10-9 atm cc / sec on the Varian 979) with a great flood of helium on all joints with no response anywhere.

Attachment 1: TM3_Heat_Shield_Water_Block_-_c-seal_vs_delta_seal_DRAFT_3Sept2013.pdf  2.172 MB  | Show | Hide all