Thursday, August 29, 2013, 09:08, chad fisher, South Hot-Cell, Repair, TM3, , Heat Shield Circuit Leak
|
Thursday, August 29, 2013, 10:09, Bevan Moss, South Hot-Cell, Repair, TM3, , Heat Shield Circuit Leak
|
Thursday, August 29, 2013, 12:03, Grant Minor, South Hot-Cell, Repair, TM3, no target, Heat Shield Circuit Leak
|
|
Message ID: 435
Entry time: Thursday, August 29, 2013, 09:08
Reply to this: 436
|
Author: |
chad fisher |
Category: |
South Hot-Cell |
Type: |
Repair |
Module: |
TM3 |
Target/Number: |
|
Subject: |
Heat Shield Circuit Leak |
|
|
The heat shield circuit was pressurized with air (15-20 psi) and snoop applied to the water block joint and brazes. Bubbles formed at the joint between the two water blocks indicating that the leak is a c seal problem. Pictures attached but also on docushare Collection-11285. |
|
|
|
|