ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
2276
|
Wednesday, November 24, 2021, 09:08 |
Adam Newsome | Conditioning Station | Standard Operation | TM4 | | Remotely moved TM4 from SHC to TCS | TM4 was moved from the South Hot Cell to
the Conditioning Station. |
|
375
|
Tuesday, June 04, 2013, 15:34 |
Bevan Moss | Conditioning Station | Repair | | | Relay replaced | ESC was called out again to inspect the
chiller as it was showing the same problem
as before. This time when started one fan |
|
2211
|
Wednesday, April 21, 2021, 11:18 |
David Wang | Cooling | Maintenance | | | Refilling high active wtaer system and starting HA water pumps. | High active water system is refilled. Air
are drained out of system before pump
to be started. Following sequence are used |
|
2140
|
Thursday, August 27, 2020, 09:42 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | Ta#60 | Refilled TK2 | Refilled TCS:TK2 from 10 in to 22 in using
the newly installed valve. |
|
649
|
Monday, April 14, 2014, 13:58 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | I reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE |
|
722
|
Tuesday, August 05, 2014, 11:53 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | ITE entrance module is reconnected in ITE. |
|
756
|
Wednesday, September 24, 2014, 15:16 |
David Wang | ITE | Standard Operation | TM4 | Ta#44 | Reconnected TM4 in ITE. | TM4 has been reconnected back to ITE. I
started all turbo pumps on ITE and TM4. The
ITE TP4s was extremely difficult to start. |
|
698
|
Wednesday, July 02, 2014, 14:29 |
David Wang | ITE | Standard Operation | | | Reconnected TM3 in ITE. | I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical |
|
604
|
Thursday, February 20, 2014, 11:04 |
chad fisher | South Hot-Cell | Repair | TM2 | | Readying TM2 for C-Seal Leak Check | Containment box has been removed and water
block jig installed. |
|
1639
|
Tuesday, October 10, 2017, 10:45 |
David Wang | Conditioning Station | Repair | | | Re-route TCS water lines. | TCS cooling polyurethane lines have
been re-routed to solve to HV sparking issue
on old configuration between lines and bais |
8x |
2202
|
Wednesday, March 17, 2021, 11:43 |
Frank Song | ITE | Repair | | | Re-connect Entrance Module in ITE | David and I re-connect Entrance module
at ITE after the monitor been replaced at
SHC. |
|
2158
|
Tuesday, October 27, 2020, 11:46 |
Matthew Gareau | North Hot-Cell | Repair | | | Ratcheting repair issues with both left and right master |
|
|
1936
|
Monday, June 10, 2019, 08:26 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping voltage on TM4 w/o source tray | TM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC |
|
1938
|
Monday, June 10, 2019, 16:22 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping V on TM4, no HV cover in TH | Ramped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV |
|
826
|
Monday, January 05, 2015, 15:01 |
Anders Mjos | Conditioning Station | Development | TM2 | | RGA switched on | |
|
816
|
Friday, December 05, 2014, 15:41 |
Anders Mjos | Conditioning Station | Development | TM2 | | RGA results | Measurement taken at 14:25. IG2 at ~7.7E-6
T |
|
473
|
Thursday, September 26, 2013, 15:00 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | RGA not connecting | Following the helium pressure test
Don attempted to connect to the RGA via the
network. He was unable to do so. This scan |
|
913
|
Monday, May 11, 2015, 10:45 |
Anders Mjos | Conditioning Station | Maintenance | | | RGA electronics box installed | The communications chip has been
replaced. The electronics box has been grounded
(see attached pdf). |
|
1311
|
Tuesday, August 09, 2016, 11:36 |
Anders Mjos | Conditioning Station | Maintenance | | | RGA and CG1S moved | The locations (ports) for the RGA
and CG1S was swapped today by Anders and
Isaac to provide clearance for the North |
|
372
|
Wednesday, May 29, 2013, 12:07 |
chad fisher | South Hot-Cell | Development | | SiC#28 RFQ | RFQ Autopsy | Major portions of the RFQ target have now
been sucessfully dismantled. More minor dismantling
with conclude this afternoon. |
|