2000
|
Friday, October 04, 2019, 16:43 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS. | TM2 has been connected at TCS this morning.
helium pressure test on Tm2 HS line is done.
No leak. |
|
2002
|
Monday, October 07, 2019, 09:56 |
Adam Newsome | ITE | Standard Operation | TM2 | Ta 59 | TM2 Move | TM2 has been moved from the Conditioning
Station to ITE with Ta#59 target. |
|
2003
|
Monday, October 07, 2019, 14:03 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | TM2 has been connected in ITE. | Tm2 with Ta 59 has eben connected in ITE.
Turbo pumps are started. See checklist |
|
2020
|
Thursday, October 31, 2019, 10:17 |
David Wang | Assembly/Bench Test | Maintenance | TM2 | | Febiad target gas line leak check. | Feibiad gas line for ITE and its adapter
fittings for TM2 are tested today by installing
them on a dummy water stem. No leak on VCO |
|
2021
|
Tuesday, November 05, 2019, 10:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Module move | TM#2 with Ta#59 has been moved from
the ITE to the south hot cell. |
|
2022
|
Tuesday, November 05, 2019, 11:57 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | Ta#59 disconnection checklist | See attachment |
|
2023
|
Tuesday, November 05, 2019, 12:46 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ta#59 | Ta#59 removed | Ta#59 has been removed from TM2 and it
is now ready for electrical check. |
|
2024
|
Tuesday, November 05, 2019, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check | Results of the electrical check of
TM#2 with the old Ta#59 target and target
free. |
|
2025
|
Thursday, November 07, 2019, 08:56 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC#38 | TM2 in TCS. | Helium pressure leak check on TM2 HS line
at TCS is done. No leak. Also, Helium are
sprayed to gas line adapter and fittings. |
|
2026
|
Thursday, November 07, 2019, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#38 | Conditioing SiC#38 | Thursday, November 07, 2019, 10:35: Tested
source to 30 A on TGHT, TBHT and COIL. ANODE
at 100 V. |
|
2027
|
Tuesday, November 12, 2019, 10:02 |
Adam Newsome | ITE | Standard Operation | TM2 | SiC#38 | TM2 Move | TM2 was moved from the Conditioning Station
to ITE, with SiC#38 target. |
|
2030
|
Tuesday, November 19, 2019, 13:41 |
David Wang | ITE | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC#38 connection check list. | TM2 was connected in ITE 12th Nov. attach
checklist |
|
2031
|
Tuesday, November 26, 2019, 10:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 | Module move | TM#2 with SiC#38 has been moved from
ITE to the south hot cell. |
|
2032
|
Wednesday, November 27, 2019, 13:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC #38 disconnection checklist. | TM2 was disconnected in ITE yesterday. |
|
2033
|
Friday, November 29, 2019, 11:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 SiC#39 | Electrical Check | Results from the electrical check
with the old SiC#38 target and the new SiC#39. |
|
2034
|
Friday, November 29, 2019, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#39 | Module move | TM#2 with the SiC#39 target has been
moved from the south hot cell to the east
target station. |
|
2035
|
Friday, November 29, 2019, 13:10 |
David Wang | ITE | Standard Operation | TM2 | SiC 39# febiad | TM2 SiC#39 connection check list. | TM2 has been connected in ITE.
All turbo-pumps are started. |
|
2053
|
Wednesday, January 29, 2020, 12:37 |
David Wang | ITE | Standard Operation | TM2 | | ITE primary/secondary vacuum vessel leak check. | Leak check on ITE vacuum vessel is done.
LD base leak rate 0.0XE-9atm.cc/sec. base
pressure 0.0Xe-4torr. Sprayed helium on all |
|
2071
|
Thursday, February 27, 2020, 09:50 |
Travis Cave | Safe Module Parking | Standard Operation | TM2 | SiC#39 | Module move | TM#2 with SiC#39 has been moved from
the east station to the smp. |
|
2072
|
Thursday, February 27, 2020, 10:37 |
David Wang | Safe Module Parking | Standard Operation | TM2 | | Start of SMP vacuum pump. | TM2 in SMP with old SiC #39 target on it.
SMP vacuum pump is started. |
|