Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2072     Entry time: Thursday, February 27, 2020, 10:37
Author: David Wang 
Category: Safe Module Parking 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: Start of SMP vacuum pump. 

TM2 in SMP with old SiC #39 target on it. SMP vacuum pump is started.

ELOG V2.9.2-2455