1813
|
Wednesday, October 31, 2018, 14:20 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#25 | Module move |
TM#2 with UC#25 has been moved from the south hot cell to the conditioning station. |
1814
|
Wednesday, October 31, 2018, 14:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 and UC#25 | Electrical Check |
TM#2 with targets nSiC#1 (old target) and UC#25 (new target) electrical check results. See attached for details. |
Attachment 1: Electrical_Chk__TM#2_nSiC#1_SHC_Post_Beam_Oct-31-2018.pdf
|
|
Attachment 2: Electrical_Chk_TM#2_UC#25_SHC_Oct-31-2018.pdf
|
|
1815
|
Thursday, November 01, 2018, 11:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx 25. | TM2 HS line helium pressure test at TCS and helium spray at SHC.. |
Chad and I did leak check on TM2 HS line at SHC yesterday. Base LR 0.0XE-9 atm.cc/sec. No response on LD. during helium spray. Today , I did helium pressure test at TCS. base LR 0.0xe-9atm.cc/sec. applied 70psi helium for 3 minute. leak rate slowly climbed to2.2 Xe-7 atm.cc/sec ate stopped there. The result is close to before. |
1817
|
Monday, November 05, 2018, 14:27 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#25 | Target module disconnected |
Frank and Anders disconnected the water and electrical connections this afternoon after the target was conditioned over the weekend. The heater ramping program ran with the wrong gauge selected, causing the vacuum to go higher than planned. The module will be moved to ITW tomorrow. |
1818
|
Tuesday, November 06, 2018, 10:59 |
Travis Cave | ITW | Standard Operation | TM2 | UC#25 | Module move |
TM#2 with UC#25 has been moved from the conditioning station to the west target station. |
1819
|
Wednesday, November 07, 2018, 09:50 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | TM2 connected in ITW |
TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only (dwg). Link to check list on DocuShare. |
1821
|
Wednesday, November 14, 2018, 16:10 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal troubleshooting |
Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected. |
Attachment 1: 2018-11-13_FC5.pdf
|
|
1823
|
Thursday, November 22, 2018, 08:53 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | Block move |
Frank and Anders moved blocks from ITE to ITW yesterday |
1824
|
Thursday, November 22, 2018, 08:55 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal limit switch installed |
Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system. |
Attachment 1: FC5_limit_switch.jpg
|
|
1846
|
Friday, January 04, 2019, 08:48 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been disconnected in ITW. |
TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.
TP1 and TP2 had been disconnected. TM2 with UCx 25 disconnection checklist, See attachment. |
Attachment 1: UCx25_TM2_disconnection_checklist.pdf
|
|
1848
|
Tuesday, January 08, 2019, 08:49 |
David Wang | ITW | Standard Operation | TM2 | | TP1 TP1 have been disconnected in ITW |
Started argon venting of ITW now. |
1850
|
Wednesday, January 09, 2019, 10:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#25 | Module move |
TM#4 with UC#25 has been moved from ITW to the south hot cell. |
1851
|
Wednesday, January 09, 2019, 13:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#25 | Electrical Check |
Electrical check of the target module with the UC#25 attached after the beam run. |
Attachment 1: Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf
|
|
1853
|
Thursday, January 10, 2019, 09:26 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move |
TM#2 has been moved from the south hot cell to the conditioning station. |
1854
|
Thursday, January 10, 2019, 10:45 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is under vacum at TCS. |
TCS: TP1, TP2 and TP1S are started. |
1856
|
Friday, January 11, 2019, 13:17 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 vacuum system are switched off for this Sunday power outage. |
I will restart all pumps Monday morning. |
1858
|
Monday, January 14, 2019, 07:07 |
David Wang | Conditioning Station | Maintenance | TM2 | | Restarted TCS vacuum system . |
No issue. |
1861
|
Tuesday, January 22, 2019, 09:56 |
David Wang | ITW | Maintenance | TM2 | | ITW water system maintenance. |
ITW water system maintenance is done. All working paddle wheels and coils are replaced. ITW water system polyurethane tubes are replaced as well. Two 3/8" leak small valves on return lines are replaced. 85 liters of tritium water are transferred from storage tank to B2 level holding tank. LALC water are refilled into S-tank. Restarted pump and checked system. Everything works fine now. No water leak has been found so far. |
1863
|
Monday, January 28, 2019, 10:41 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS |
leak detector base LR: 0.0Xe-9atm.cc/sec. helium 70 psi. test time : 3 minutes for each circuit.The results in atm.cc/sec are Ta+(A):1.8 XE-8. TA-(B):0.0xE-9. Tu-(C):1.2XE-7. TU+(D):1.6XE-7. Coil 2 (PQ):0.0XE-9. Coil 1 (RU):0.0XE-9. MSP:2.2XE-7. EE:1.0XE-7. HS:N/A. Window:5.8XE-9 |
1866
|
Thursday, February 14, 2019, 07:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS vacuum pumps have been stopped. |
Preparation on TM2 move from TCS to SHC. |