Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1866     Entry time: Thursday, February 14, 2019, 07:13
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: TCS vacuum pumps have been stopped. 

Preparation on TM2 move from TCS to SHC.

ELOG V2.9.2-2455